BARCO 12
Daylight Display Systems
Connection
What has to be
done
Power linking and data linking cables have to connect the AEC unit to the display
Necessary Tools
n/a
continued on next page
Interconnection
Follow the next procedure:
1
2
3
1,2
2
2
Connect the power out of the last tile in a power chain (upto
the 6th tile in a power chain), with the power in of the AEC.
Connect the data out of a tile with the data in of the AEC.
Connect the AEC data out 1 to the data in of the next tile in
the data chain.
Step
Action
Image
power in
data in
data out 1
(not utilised)
Image 1
Connectors
IMPORTANT all plug
holder clamps must
be locked firmly