Installation
Barco - OV-808, OV-815– R599874 – installation manual – revision 01– November 2007 ___________________________________________________________ 62
Step 85
LAN Subnet
The projection modules are controlled via a web
application. All projection units are connected in a
subnet via LAN switches.
One LAN switch serves 6 projection modules. The
cable layout depends on the actual configuration.
In case the display wall is 6 modules in height, one
column is connected to the switch, otherwise
multiple columns are connected to the switch. During
installation, the position of the switch has been
selected to minimize distances, cf. .Step 62
For the LAN cabling, proceed as per column.
Connect all projection units of a column to the LAN
switch installed in the same column or in the next
column.
Care for a clear layout!
Digital sources are connected to DVI 1 IN and/or
DVI 2 IN. DVI 1 IN is loop-through to DVI 1 OUT,
DVI 2 IN is loop-through to DVI 2 OUT.
In case a source has to be displayed on additional
projection modules, connect the respective DVI
output with one of the DVI inputs of the other
projection module
Step 86
The cables have to be fixed to the sidewalls via cable
ties. The cable ties are inserted into the square duct
of the plastic cable tie holders already mounted to
the left and right sidewalls.
Step 87
At the bottom of each column, all cables are guided
to the right, using the cable guide fixation facilities
provided on the cable hub.
The systems provide everything to have a tidy
cabling! Make use of these facilities!
Summary of Contents for OV-808
Page 1: ...Installation manual OV 808 OV 815 R599874 ...
Page 15: ......