Installation
Barco - OV-808, OV-815– R599874 – installation manual – revision 01– November 2007 ___________________________________________________________ 48
Step 65
Fix the cabling interface.
Seen from front, the cabling interface is mounted to
the right sidewall of a projection module located in
the mid of a column!
This position ensures that every projection unit can
be connected via 5m LAN cables!
The sheet metal is fixed to the sidewall via 4 screws.
Summary of Contents for OV-808
Page 1: ...Installation manual OV 808 OV 815 R599874 ...
Page 15: ......