5. Installation
Barco - OV-508/OV-513/OV-515– R5990099 – installation manual – revision 01– November 2007 ________________________________
________________________________
________________________________
________________________________________________
________________
________________
________________ 44
5.14
Installation of the projection unit
Step 46
On the engine profile there are also two pins to hang
the projection unit on. Subsequently fix the projection
unit with 3 screws.
In contrast to the projection unit of the first
generation, the fixation facilities are arranged
differently: there are two screws on top of the
connection bracket of the projection unit, and one
centered beneath them.
Hang the projection unit onto the pins so that the
distance from the illumination unit is at max.
Later the illumination unit and the projection unit
have to be moved towards each other for a close and
smooth connection of the air and light inlets!
Summary of Contents for OV-508
Page 1: ...Installation manual OV 508 OV 513 OV 515 R5990099 ...
Page 15: ......