bottom row
adjusted to one level
Step9
When all screens of the bottom row are installed,
level the screens!
Loosen the 4 locking screws to move the screen
slightly in vertical direction.
Adjust the vertical position of the screens that the
upper border of the front elements make a straight
line.
Step10
Install the screens of the second row:
Start with the screen on top of the static screen.
Lock it in horizontal direction by applying 2x1 screw
diagonally.
Take care that all 4 vertical movement plates are in
their nominal position, i.e. the drillings of the plate
flush with the threads of the frame.
Mount the screen that its position is symmetric and
that it is touching the screen below.
Completely remove the horizontal movement screws.
Step11
Install the other screens of the second row.
These screens must not be locked in any direction!
Therefore no screws have to be applied!
Screw in the horizontal movement screws until the
screen front is moved approx. 1mm against the
vertical frame towards the horizontal movement
screw.
Since these screen feature full movability, no screws
have to be applied and fixed.
When the screens are mounted and the gap to the
adjacent screen closed by turning the horizontaol
movement screws, completely remove these screws!
Step12
The leveling of the upper border of that row and the
rows above is determined just by the tolerance of the
screen size which is very tight.
So the leveling should be already quite good.
In case there is still a small gap to the adjacent
screen, apply the leveling tape B195707, covering
the entire width!