7. Basic set up procedures
A
B
C
Image 7-17
Install stacker foot.
A
Stacker foot.
B
Stacker foot rail.
C M12 bolt.
3. Move the stacker foot forwards against the OLite rental foot and secure the eight bolts tightly.
4. Place the stacker bridge into position and secure the bridge with a lock key and two spring cotters.
Note:
The small handle to operate the side locking mechanism has to stand in vertical position, otherwise the handle gets in
the way to install the stacker bridge. Pull out the small handle and turn counterclockwise until the handle stands vertical.
Image 7-18
Install stacker bridge.
5. Place the stacker profile vertical with the narrow end inside the stacker foot.
R5976832 OLITE RENTAL DISPLAY 15/12/2004
33
Summary of Contents for OLite 510
Page 1: ...OLite rental display Installation manual R5976832 00 15 12 2004...
Page 4: ......
Page 10: ...1 Safety 6 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 12: ...2 Installation requirements 8 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 14: ...3 System overview 10 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 22: ...4 Components of an OLite rental tile 18 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 46: ...7 Basic set up procedures 42 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 52: ...8 Cabling of an OLite rental display 48 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 54: ...9 Maintenance 50 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 64: ...A Dimensions 60 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 70: ...C Order info 66 R5976832 OLITE RENTAL DISPLAY 15 12 2004...