1. Operating conditions
1.5
Initial Inspection
General
Before shipment, the projector was inspected and found to be free of mechanical and electrical defects. As soon as the projector is
unpacked, inspect for any damage that may have occurred in transit. Save all packing material until the inspection is completed. If
damage is found,
fi
le claim with carrier immediately. The Barco Sales and Service of
fi
ce should be noti
fi
ed as soon as possible.
Mechanical check
This check should con
fi
rm that there are no broken knobs or connectors, that the cabinet and panel surfaces are free of dents and
scratches, and that the meter face and operating panel are not scratched of cracked. The Barco Sales and Service of
fi
ce should be
noti
fi
ed as soon as possible.
8
R59770091 DP-1500 06/01/2009
Summary of Contents for DP-1500
Page 1: ...DP 1500 Installation manual R59770091 06 06 01 2009 ...
Page 14: ...1 Operating conditions 10 R59770091 DP 1500 06 01 2009 ...
Page 32: ...3 Mechanical set up of the DP 1500 28 R59770091 DP 1500 06 01 2009 ...
Page 48: ...5 Lenses lens holder 44 R59770091 DP 1500 06 01 2009 ...
Page 66: ...6 Lamp lamp house 62 R59770091 DP 1500 06 01 2009 ...
Page 84: ...9 Starting up 80 R59770091 DP 1500 06 01 2009 ...
Page 92: ...10 Projector registration Image 10 9 Add new owner 88 R59770091 DP 1500 06 01 2009 ...
Page 126: ...12 Servicing 122 R59770091 DP 1500 06 01 2009 ...
Page 142: ...13 Removal and installation of projector covers 138 R59770091 DP 1500 06 01 2009 ...
Page 143: ...A Specifications A SPECIFICATIONS R59770091 DP 1500 06 01 2009 139 ...
Page 144: ...A Specifications 140 R59770091 DP 1500 06 01 2009 ...
Page 146: ...A Specifications 142 R59770091 DP 1500 06 01 2009 ...
Page 154: ...C Pin configurations 150 R59770091 DP 1500 06 01 2009 ...
Page 155: ...D Order info D ORDER INFO R59770091 DP 1500 06 01 2009 151 ...
Page 156: ...D Order info 152 R59770091 DP 1500 06 01 2009 ...
Page 158: ...D Order info 154 R59770091 DP 1500 06 01 2009 ...