Date: 03/06/98 Page 4
Installation guidelines
R9827341
R9827342
CM 100
CONTENTS
INSTALLATION GUIDELILNES
1. Mounting instructions for the upper
support to the ceiling.(Fig. 1)
a. Position of the upper support on the
ceiling.
b. Mounting of the 4 screwed rods on the
upper support.
2. Projector placement on lower support.
(Fig. 3)
a. Projector placement on support.
b. Location of controls for projector-position
correction.
3. Mounting instructions of the cord to lift up
the projector.
a. Mounting the cord support on the upper
support.(Fig 2)
b. Cord insertion between the upper and lower
support.(Fig.4-5)
c. Cord fixation (Fig. 4)
4. Lifting up and fixing the lower support (with
projector) on the screwed rods.
5. Alignment of the projector-support assem-
bly
a. Projector water-level adjustment.
b. Adjustment "projector axis perpendicular" on
the screen surface.
c. Projector movement for- or backward.
)LJ
)LJ
)LJ
)LJ
)LJ
)LJ
All manuals and user guides at all-guides.com