2. Projector placement on lower support and adjustment controls

a. Projector placement on lower support (refer to fig. 3)

- Place the projector on a table on rollers, projector cover faced to the table or place the projector in the same

way on the ground, just under the installed upper support.

Important

in order not to scratch the projector housing, put a blanket on the table or on the ground.

- Insert the 4 "projector-position correction" controls as shown in detail on fig. 3.  The screw head of each control

must be placed to the outside so that it is possible to adjust with a screwdriver.

  Slide the outsides of the lower support (A) under the angle-section (B) of the projector  fixation plate while

pushing in the security pin (F) on both sides of the support until the security pins fit into their fitting.

- Secure the position of the support by tightening the security-nuts (G) on pins (F).

- Mount the four security chains as shown in fig 7 (page 18), using the indicated holes according to the

type of projector that is used.

MUST CHANGE FOR SAFETY: if the holes in the base plate (for chain mounting) are not available, you

have to drill the four holes yourself according to figure 8 (page 19). Further, mount the four security

chains as already shown in fig 7 (page 18).

b. Location of controls for projector-position correction

Refer to chapter 5 for explanation of the controls below.

- (D) Fine water-level adjustment of the projector

- (E) Projector axis adjustment

3. Mounting instructions of the cord to lift up the projector

a. Mounting the cord support on the upper support. (refer to fig. 2)

Mount first both security plates as shown on fig. 2.

Slide the cord support  in the support holder on the upper support until its locks in the reference holes 2

(cfr. chapter 1a- attention).

b. Cord insertion (refer to fig 4&5)

Starts the cord insertion on the upper support and insert the cord as illustrated in the mentioned figures.

c. Cord fixation (refer to photo, fig. 4)

Run the top of the cord through the hole of the fixation bracket on the lower support for approx. 1m and fixate

this latter to the main cord by means of three clamps as illustrated on photo. Tighten the clamp screws very

strongly to ensure good fixation and for safety .

All manuals and user guides at all-guides.com

Summary of Contents for CM 100

Page 1: ...rt to the ceiling is for both products the same For the support without pulley skip the paragraphs handling about the pulley on the next pages CAUTION THIS SUPPORT IS DESIGNED FOR USE ONLY WITH THE BARCO 800 AND 1000 SERIES PROJECTORS USE WITH OTHER APPLIANCES MAY RESULT IN IN STABILITY CAUSING POSSIBLE INJURY SEE ALSO PAGE 2 Ceiling support All manuals and user guides at all guides com a l l g u ...

Page 2: ...N SERIOUS PERSONAL INJURY WARNING THIS SUPPORT IS PROVIDED WITH FOUR SECURITY CHAINS NOT INSTALLING THE SECURITY CHAINS MAY RE SULT IN SERIOUS PERSONAL INJURY CAUTION INSTALLING THE SUPPORT MOUNT SHOULD BE PERFORMED ONLY AFTER YOU ARE THOROUGHLY FAMILIAR WITH ALL OF THE FOLLOWING SAFETY CHECKS AND INSTALLATION GUIDELINES TO DO OTHERWISE INCREASES THE RISK OF HAZ ARDS AND INJURY TO THE USER All man...

Page 3: ...Date 03 06 98 Page 3 Installation guidelines R9827341 R9827342 CM 100 Lower support Projector Lowered ceiling Cord support Upper support Screwed rods All manuals and user guides at all guides com ...

Page 4: ...controls for projector position correction 3 Mounting instructions of the cord to lift up the projector a Mounting the cord support on the upper support Fig 2 b Cord insertion between the upper and lower support Fig 4 5 c Cord fixation Fig 4 4 Liftingupandfixingthelowersupport with projector on the screwed rods 5 Alignment of the projector support assem bly a Projector water level adjustment b Adj...

Page 5: ...rtothescreen distance Screen front support projector Mounting distance upper support from the screen see fig 5 Attention refer to fig 3 4 Keep in mind that the mentioned distance corresponds with a projector mounting with the screwed rods in the fixation holes 2 This fixation allows to move the projector 5cm for or backward without changing the upport support mounting see point 5c The mounting dis...

Page 6: ... 4 screwed rods refer to fig 2 6 Screw one nut on each screwed rod Screw the four rods fully in the welded nuts on the upper support and secure each rod by fastening nut 1 see fig6 Determination of the lenght of the screwed rods The lenght of the screwed rods is to be determined as follows refer to fig 6 the height of the lowered ceiling if there is one the position of the top side of the screen w...

Page 7: ...f projector that is used MUST CHANGE FOR SAFETY if the holes in the base plate for chain mounting are not available you have to drill the four holes yourself according to figure 8 page 19 Further mount the four security chains as already shown in fig 7 page 18 b Location of controls for projector position correction Refer to chapter 5 for explanation of the controls below D Fine water level adjust...

Page 8: ...very slowly to avoid swaying of it Persons not involved with the instal lation have to be kept out of the work ing area After all safety precautions have been taken proceed to lift up the projector Whiletheassistent pullsonthecord theleaderholdstheprojectorintopositionuntilthescrewedrodspassthrough the fixation holes on the lower support holes 2 The assistent holds the projector in this position w...

Page 9: ...evel Do the same adjustment for the following adjacent side Secure the water level postion of the projector by fastening the nuts 2 the lower support is clamped between nut 1 and 2 Secure nut 2 by tightening the locking nut 3 against nut 2 IMPORTANT On each corner of the lower support an ajustable screw D allows a small correction for the projector water level Turning clockwise lifts up the projec...

Page 10: ...ure tubes sharp focussing left right If the projector axis is not perpendicular to the screen surface turn screw C clock or anticlockwise until axis is perpendicular to the screen When all adjustments are made put the lifting cord on the projector and close the lowered ceiling around the projector If there is no lowered ceiling the cord has to be removed All manuals and user guides at all guides c...

Page 11: ...lows Remount the cord if it was removed Refer to point 4 the assistent pulls slightly on the cord to hold the projector in posi tion while the leader removes the nuts 2 and 3 on each screwed rod Now let down the projector slowly until it stands again on the roll tabel or on the floor Refer to point 3a Move the cord support on the upper support until it locks in ref holes 1 projector movement forwa...

Page 12: ...Date 03 06 98 Page 12 Installation guidelines R9827341 R9827342 CM 100 LAY OUT UPPER SUPPORT All manuals and user guides at all guides com ...

Page 13: ...Date 03 06 98 Page 13 Installation guidelines R9827341 R9827342 CM 100 25 6833257 5217 2 833 5 6833257 17 5 833 5 6833257 Fig 2 Fig 3 All manuals and user guides at all guides com ...

Page 14: ...Date 03 06 98 Page 14 Installation guidelines R9827341 R9827342 CM 100 Fig 3 All manuals and user guides at all guides com ...

Page 15: ...Date 03 06 98 Page 15 Installation guidelines R9827341 R9827342 CM 100 Fig 4 All manuals and user guides at all guides com ...

Page 16: ... 06 98 Page 16 Installation guidelines R9827341 R9827342 CM 100 Fig 5 17 5 XSSHU VXSSRUW 0 1 7 0 3 67 1 6 5 1 5217 833 5 6833257 3 PP 2 3 1 All manuals and user guides at all guides com a l l g u i d e s c o m ...

Page 17: ...Date 03 06 98 Page 17 Installation guidelines R9827341 R9827342 CM 100 Fig 6 All manuals and user guides at all guides com ...

Page 18: ...ing holes Mounting holes Mounting holes Mounting holes Mounting holes FIGURE 7 Mounting of the security chain PROJECTORS 801 Projector 808 Projector 1000 series Projector screw washer washer chain nut plate Fixing point Fixing point Security chain All manuals and user guides at all guides com ...

Page 19: ...idelines R9827341 R9827342 CM 100 FIGURE 8 Drilling the four holes for chain mounting drill four holes of diameter 6 5mm 0 256 12mm 0 472 12mm 0 472 12mm 0 472 6HULHV SURMHFWRU 6HULHV SURMHFWRU All manuals and user guides at all guides com ...

Reviews: