A. Barco Control Manager
A.6.1
Start Up
Start Up
To start up the control window:
1. Click on Diagnostics.
A drop down menu will be displayed. (image A-18)
Image A-18
Diagnostics start up page
Available items
•
General Status
•
Job Log
•
Advanced Diagnostics
A.6.2
General Status
What is available
The general status page gives an overview of:
•
the projector status
•
type of projector
•
current source
•
run time
•
lamp life time
•
software version
A.6.3
Job Log
Overview
The job log screen gives an overview of the last 30 logs stored in the projector.
R5976333 BARCOELM R18 17092002
121
Summary of Contents for BARCOELM R18
Page 1: ...BARCOPROJECTION BARCOELM R18 R9001990 OWNERS MANUAL 17092002 R5976333 02 ...
Page 4: ......
Page 8: ...Table of contents 4 R5976333 BARCOELM R18 17092002 ...
Page 28: ...3 Installation Guidelines 24 R5976333 BARCOELM R18 17092002 ...
Page 38: ...4 Connections 34 R5976333 BARCOELM R18 17092002 ...
Page 48: ...5 Getting Started 44 R5976333 BARCOELM R18 17092002 ...
Page 90: ...8 Installation Mode 86 R5976333 BARCOELM R18 17092002 ...
Page 104: ...9 Service Mode 100 R5976333 BARCOELM R18 17092002 ...
Page 106: ...10 Programmable Function Keys 102 R5976333 BARCOELM R18 17092002 ...
Page 110: ...11 Standard Source set up Files 106 R5976333 BARCOELM R18 17092002 ...