OPERATION OF CRANE ASSEMBLY:
The TriBor has an optional full function crane assemble. Unit is located above the breakouts.
Perfect for loading and unloading drill pipe or pilot rod.
Powering up the crane- The umbilicals are connected and the engine is running.
1-
Turn the battery disconnect switch to the ON position.
2-
Turn the crane power switch to the ON position.
3-
Turn the hydraulic valve for the crane to the ON position.
4-
Push the e-stop in and then twist it clockwise to release it. This will boot up the remote.
The crane is ready to operate.