Verify Communications
After powering up and binding the Gateway and its Nodes, verify all devices are communicating properly. Verify LED 1 is green. Until
communication is established with the Gateway, the Node’s LED 2 flashes red. When communication is established, the Node’s LED 1
flashes green.
A Node will not sample its inputs until it is communicating with the Gateway to which it is bound.
LED 1
LED 2
Gateway Status
Node Status
(green on)
Power ON
(green flashing)
RF Link OK
(red flashing)
(red flashing)
Device Error
Device Error
(yellow flashing)
Modbus Communication Active
(red flashing)
Modbus Communication Error
No radio link (when flashing
once every three seconds)
For Gateway and Ethernet Bridge systems, active Modbus communication refers to the communication between the Gateway and the
Ethernet Bridge. For GatewayPro systems, the Modbus communication LEDs refer to the communication internal to the Gateway Pro.
For Gateway only systems, the Modbus communication LEDs refer to the communication between the Gateway and its host system (if
applicable).
When testing the Gateway and Node, verify all radios and antennas are at least two meters apart or the communications may fail.
SureCross Wireless I/O Network Manual
58
www.bannerengineering.com - tel: 763-544-3164
rev. I