SureCross™ DX80 Quick Start Guide
P/N 128185 Rev A
Banner Engineering Corp. • Minneapolis, MN U.S.A.
www.bannerengineering.com • Tel: 763.544.3164
8
Quick Start:
STEP 4
> Verify Communications, Gateway
Verify LED 1 is on and green.
Verify LED 1 is
fl
ashing Green and LED 2 is off. Until communication is established with the
Gateway, the Node’s LED 2
fl
ashes Red. When communication is established, the Node’s
LED 1
fl
ashes Green.
Status
LED 1
LED 2
Power ON
Green ON
—
System Error
Red Flash
Red Flash
Modbus Communication Active
—
Yellow Flash
Modbus Communication Error
—
Red Flash
Status
LED 1
LED 2
System Error
Red Flash
Red Flash (1 per sec)
RF Link Ok
Green Flash (1 per sec)
—
RF Link Error
—
Red Flash (1 per 3 sec)
> Verify Communications, Node
If testing the Gateway and Node before installation, verify the Gateway and Node are at
least two meters apart or the communications may fail.