background image

6  -  8  Fiveways  Boulevard,  Keysborough,  VIC,  Australia  3173           
P: 1300 133 944      E: [email protected]      
W: www.automatictechnology.com.au

Specifications

Battery Back up Specifications

Garage Door

Swing

Slider

Approximate number of Cycles under battery power

10

10

10

Average Cycle Time under battery power (Opening and Closing) 40 seconds

90 seconds

90 seconds

Wire Gauge and Length from Battery to Charger board (max)

18AWG, 3m

18AWG, 3m

18AWG, 3m

Battery capacity (Amp Hours)

2.3 AH

2.3 AH

2.3 AH

Time for Re-charge

24 - 48 Hours

24 - 48 Hours

24 - 48 Hours

Troubleshooting

Maintenance

To ensure a long trouble free life for your battery backup it is recommended you run the testing procedure on a monthly basis. 

Batteries should not need replacing for 4 - 5 years.

Testing Procedure:

a.  Press the transmitter to activate the opener. 

b. Whilst the door / gate is in motion disconnect power. The door / gate should complete the cycle as normal.

c.  Wait for the door / gate to finish is travel.

d. Press the transmitter to activate the opener.

e.  Whilst the door / gate is in motion reconnect power. If the door / gate stopped or moved very slosly under battery power, 

ensure mains power is connected for 24 - 48 hours to recharge the batteries. Test the opener again under battery power in 

72 hours to ensure batteries are working effectively.

Symptom

Possible cause

Remedy

Door stops or moves very slowly 

under battery power

Batteries may be weak or have 

no charge

Connect mains power and allow the batteries 

to charge. This may take 24 - 48 hours to reach 

maximum charge capacity.

Door will not operate when 

mains power is disconnected.

Batteries / charger board may 

not be connected properly.

Check wiring.

Batteries may have no charge

Connect mains power and allow the batteries 

to charge. This may take 24 - 48 hours to reach 

maximum charge capacity.

Faulty Charger board

Disconnect the charger board from batteries and 

control board. Check voltage of the charger board. 

Voltage should be approximately 27.5V.

Faulty Batteries

Disconnect the batteries from the charger board. 

Check the voltage of the each battery. Voltage 

should not drop below 10V.

Summary of Contents for V-05

Page 1: ... HARNESS 1 29 TAPTITE SCREW P M3 X 8 4 Sliding Gate Openers Important Safety Instructions WARNING DO NOT short the output of batteries Serious personal injury and or property damage can result from failure to follow this warning During charging and discharging cycles the lead acid batteries may release explosive gases Ensure that the area around the batteries is well ventilated Take care not to al...

Page 2: ... and secure right side screw first charger board side 17 b Position the wire battery harness 10 neatly and secure left side of battery kit with cable clamp 7 WARNING After Step c the opener may become active even when power is off This is a result of a residual charge in the batteries c Connect battery harnesses 5 and 10 together d Close the timing cover light diffuser and reconnect power NOTE Bat...

Page 3: ...in connector on the main control board Mount Connect the Battery a Mount battery pack on side of unit and secure with items 11 and 12 WARNING After Step b the opener may become active even when power is off This is a result of a residual charge in the batteries b Connect battery harnesses 5 and 10 together c Close the cover secure the Light Diffuser with 2 screws and reconnect power NOTE Batteries...

Page 4: ...y Box s nylon gland d Connect the red wire to the Battery Box s terminal and the black wire to the terminal e Feed the other end of the 2 core 18awg gauge cable through the control box s gland f Connect the red wire to the Charger Board s Battery Harness BAT connector and the black wire to the BAT connector Re setup and Test the Opener a Reconnect power b Select Menu 7 on the DCB 05 control board ...

Page 5: ...ing wire 27 through the main cover b Secure the lid to the main cover with screws c Connect battery harnesses 27 and 28 together NOTE Batteries may take up to 48 hours to charge fully after initial installation Re setup and Test the Opener a Reconnect power b Select Menu 7 on the control board press SET select Sub Menu 7 Battery Solar and enable using the OPEN and CLOSE buttons c Setup travel limi...

Page 6: ...finish is travel d Press the transmitter to activate the opener e Whilst the door gate is in motion reconnect power If the door gate stopped or moved very slosly under battery power ensure mains power is connected for 24 48 hours to recharge the batteries Test the opener again under battery power in 72 hours to ensure batteries are working effectively Symptom Possible cause Remedy Door stops or mo...

Page 7: ...tallation configuration or use of the Product contrary to the instructions supplied with the Product g maximum continuous operating time exceeding 1 minute in 10 h the operating force exceeding 15kg 150 Newton when moving the door manually to the open or closed position i door surface area and or weight exceeding 28m2 and 270kg respectively j the door used with the Product not being in safe workin...

Page 8: ...alia Pty Ltd ABN 25 010 473 971 B D Doors 34 36 Marigold St Revesby NSW 2212 P 13 62 63 E enquires bnd com au W www bnd com au August 2015 Automatic Technology Australia Pty Ltd All rights reserved No part of this document may be reproduced without prior permission In an ongoing commitment to product quality we reserve the right to change specification without notice E OE ...

Reviews: