background image

6  -  8  Fiveways  Boulevard,  Keysborough,  VIC,  Australia  3173           
P: 1300 133 944      E: [email protected]      
W: www.automatictechnology.com.au

Swing Gate Opener Set Up

DCB-05

Mount the Charger Board

a.  Unplug the Control Box from mains power.

b. Remove the Control Box’s cover.

c.  Secure the adhesive mounts 

21

 to the Charger Board with cable ties 

22

.  Affix the Charger Board 

20

 inside the the Control Box cover.

d. Plug the Charger Board’s four (4) wire harness (red/yellow/white/black) into the DCB-05 board’s “SBY-03” connector.

WARNING! 

The opener will become active  

during the following steps. 

Mount & Connect the Battery

a.  Drill a  hole in the Battery Pack enclosure (recommend at the bottom) and fit a nylon gland (not supplied).

b. Mount the Battery Pack 

19

 using the mounting brackets 

23

 and screws 

24

 close to the opener.

c.  Feed a 2-core 18awg gauge cable (not supplied) through the Battery Box’s nylon gland.

d. Connect the

 

red wire

 

to the Battery Box’s “+” terminal, and the 

black wire

 to the “–” terminal 

e.  Feed the other end of the 2-core 18awg gauge cable through the control box’s gland.

f.  Connect the 

red wire

 

to the Charger Board’s Battery Harness“BAT+” connector, and the 

black wire

 to the “–BAT” connector.

Re-setup and Test the Opener

a.  Reconnect power.

b. Select Menu 7 on the DCB-05 control board, press “SET”, select Sub Menu 7 (“Battery/Solar”) and enable using the “OPEN” and 

CLOSE” buttons.

c.  Setup travel limits and transmitters as per the DCB-05 instruction manual.

d. Press either “OPEN” or “CLOSE” buttons, or use a transmitter to operate the gate.

e.  Whilst the gate is in motion, disconnect mains power. The gate should continue to operate as normal.

NOTE: 

Wait for the gate to complete its travel.

f.  Press the transmitter to activate the gate. Whilst the gate is in motion re-connect power. The gate should complete the cycle as 

normal.

g. Refit the control box cover.

WARNING!

 Do not connect the batteries until 

you have connected wiring on the charger 

board.

23

24

19

9

8

22

20

1

21

Summary of Contents for V-05

Page 1: ... HARNESS 1 29 TAPTITE SCREW P M3 X 8 4 Sliding Gate Openers Important Safety Instructions WARNING DO NOT short the output of batteries Serious personal injury and or property damage can result from failure to follow this warning During charging and discharging cycles the lead acid batteries may release explosive gases Ensure that the area around the batteries is well ventilated Take care not to al...

Page 2: ... and secure right side screw first charger board side 17 b Position the wire battery harness 10 neatly and secure left side of battery kit with cable clamp 7 WARNING After Step c the opener may become active even when power is off This is a result of a residual charge in the batteries c Connect battery harnesses 5 and 10 together d Close the timing cover light diffuser and reconnect power NOTE Bat...

Page 3: ...in connector on the main control board Mount Connect the Battery a Mount battery pack on side of unit and secure with items 11 and 12 WARNING After Step b the opener may become active even when power is off This is a result of a residual charge in the batteries b Connect battery harnesses 5 and 10 together c Close the cover secure the Light Diffuser with 2 screws and reconnect power NOTE Batteries...

Page 4: ...y Box s nylon gland d Connect the red wire to the Battery Box s terminal and the black wire to the terminal e Feed the other end of the 2 core 18awg gauge cable through the control box s gland f Connect the red wire to the Charger Board s Battery Harness BAT connector and the black wire to the BAT connector Re setup and Test the Opener a Reconnect power b Select Menu 7 on the DCB 05 control board ...

Page 5: ...ing wire 27 through the main cover b Secure the lid to the main cover with screws c Connect battery harnesses 27 and 28 together NOTE Batteries may take up to 48 hours to charge fully after initial installation Re setup and Test the Opener a Reconnect power b Select Menu 7 on the control board press SET select Sub Menu 7 Battery Solar and enable using the OPEN and CLOSE buttons c Setup travel limi...

Page 6: ...finish is travel d Press the transmitter to activate the opener e Whilst the door gate is in motion reconnect power If the door gate stopped or moved very slosly under battery power ensure mains power is connected for 24 48 hours to recharge the batteries Test the opener again under battery power in 72 hours to ensure batteries are working effectively Symptom Possible cause Remedy Door stops or mo...

Page 7: ...tallation configuration or use of the Product contrary to the instructions supplied with the Product g maximum continuous operating time exceeding 1 minute in 10 h the operating force exceeding 15kg 150 Newton when moving the door manually to the open or closed position i door surface area and or weight exceeding 28m2 and 270kg respectively j the door used with the Product not being in safe workin...

Page 8: ...alia Pty Ltd ABN 25 010 473 971 B D Doors 34 36 Marigold St Revesby NSW 2212 P 13 62 63 E enquires bnd com au W www bnd com au August 2015 Automatic Technology Australia Pty Ltd All rights reserved No part of this document may be reproduced without prior permission In an ongoing commitment to product quality we reserve the right to change specification without notice E OE ...

Reviews: