Installation and Operations Manual
— Model 400E Series
16
B&B ARMR
A Division of B&B Roadway and Security Solutions 0400E-9001 Rev J
If the system you are operating is equipped with the manual override drive system the
following is done to move the gate.
Your safety is extremely important to us. Be sure to
follow all instructions. You are responsible for the
correct and safe installation, operation, and
maintenance of this equipment.
Tools needed:
1.
Manual Override Tool (supplied with original 450E equipment)
2.
Fully charged, battery operated cordless drill
3.
Access keys/codes to Receiver Stanchion, Locking Pin Access Door
Receiver Stanchion Crash Pin Release
1.
Open Crash Pin locking equipment access door (1) located on the top of the
Receiver Stanchion assembly.
2.
Use a tool or block (2) placed under the Locking Pin Plate (3) and then impress
the button on the Pull Pin (4) to remove (this releases the electrical drive assembly from
the Locking Pin assembly).
3.
Raise the Locking Pin Plate assembly (3) approximately 15 cm (6 inches) and
place the Pull Pin (4) in the hole located in the vertical weldment plate (5) to hole the
Locking pins above the moving gate assembly.
4.
Allow the Locking Pin Plate to rest on the Pull Pin.
5.
Proceed to the Drive Stanchion Manual Drive Procedure.