Installation and Operations Manual 

— Model 400E Series 

 

15 

B&B ARMR

                                                                                                                  

A Division of B&B Roadway and Security Solutions                                                                                                 0400E-9001 Rev J 

 

Figure 6  End Plates 

 
 

3.4  Operational Test 

3.4.1  Give the gate an OPEN command. The locking pin will raise (Model 450), and the 
motor will accelerate and run to move the gate open.  The first limit switch will begin the 
speed reduction of the motor.  The second limit switch will stop the motor.  If Model 400, the 
gate will move immediately upon receiving the open command. 

3.4.2 Give the gate a CLOSE command.  The motor will accelerate and run to move the gate.  
The first close limit switch will begin the speed reduction of the motor to the second close 
limit switch will stop the motor.  Once the second close limit switch is tripped, the lock pin 
will engage (Model 450). 

3.4.3  Verify that there are no interferences between the moving parts and that the limit 
switches are hitting the trip plates correctly.  Make any necessary adjustments. 

3.4.4

 

Verify the operation of the gate is smooth for the entire travel length. 

3.5  ECO Operation 

Emergency Close Operation (ECO) command acts identically to a CLOSE command 
except all safety inputs are ignored.  It should only be used during an emergency.  An 
ECO RESET must be issued after any ECO command before the gate will respond to an 
open command. 

3.6  Barrier Operation during a Power Outage

 

 

Disconnect the locking pin actuator from the locking pins and swing actuator out of the 
way to manually lift the locking pins (Model 450).  Disengage and lower the motor drive 
assembly and manually open the gate.   

3.7  Barrier Operation during a Power Outage – With Optional Manual 

Drive System 

Summary of Contents for 4X0E Series

Page 1: ...ICLE BARRIER INSTALLATION MANUAL B B ARMR Headquarters Tech Support 5900 S Lake Forest Dr Suite 230 McKinney TX 75070 Phone 800 367 0387 Fax 972 385 9887 E mail info bb armr com techsupport bb armr co...

Page 2: ...upport via telephone and possible on site support with advanced scheduling Safety Your safety is important to us If you have any questions or are in doubt about any aspect of the equipment please cont...

Page 3: ...our vehicle barrier or if we can help you with any other facility security issues please contact us directly at HQ Tech Support B B ARMR 5900 S Lake Forest Dr Suite 230 McKinney TX 75070 Phone 800 367...

Page 4: ...ents 11 2 5 Control System Installation 12 3 4 Operational Test 15 3 5 ECO Operation 15 3 6 Barrier Operation during a Power Outage 15 3 7 Barrier Operation during a Power Outage With Optional Manual...

Page 5: ...n be purchased at the time of order to allow gate opening and closing without disengaging drive assembly Motor controller ramps up and down the movement of the gate to reduce wear and shock on drive u...

Page 6: ...adway and Security Solutions 0400E 9001 Rev J 1 1 2 Drive Stanchion The drive stanchion supports the gate with the four main drive wheels and allows the drive unit to mesh with the rack located on the...

Page 7: ...electrically actuated to lock the gate closed Limit switches indicate the location of the lock pins The actuator motor 2 wires and its two limit switches 2 wires each may share a conduit to the elect...

Page 8: ...ior to the gate beam installation 2 2 3 The center of the axles must be 31 inches above the roadbed height at the roadbed s highest point If wheels are factory installed make sure the tops of the whee...

Page 9: ...nstall the four guide wheels into the guide wheel receivers on the wheel stanchion Leave the bolts fully backed off to allow the guide wheels to insert completely into the receivers 2 4 Installing the...

Page 10: ...he motor assembly 2 5 Control System Installation The electrical control enclosure is mounted on the main stanchion 2 5 1 Install power wires to breaker inside external enclosure mounted to control bo...

Page 11: ...OR Q8 RED INDICATOR Q9 ECO Q10 OPTIONAL DEVICES Loop Detector One loop detector and socket come pre wired for use as a safety The loop wires connect to terminals 7 8 on the loop detector socket The sa...

Page 12: ...ult value is 8 seconds During a malfunction the lock pins will reverse to a retracted position and the RED INDICATOR output will flash rapidly Investigation and adjustment of the trip plates and beam...

Page 13: ...econd close limit switch is tripped the lock pin will engage Model 450 3 4 3 Verify that there are no interferences between the moving parts and that the limit switches are hitting the trip plates cor...

Page 14: ...rated cordless drill 3 Access keys codes to Receiver Stanchion Locking Pin Access Door Receiver Stanchion Crash Pin Release 1 Open Crash Pin locking equipment access door 1 located on the top of the R...

Page 15: ...Installation and Operations Manual Model 400E Series 17 B B ARMR A Division of B B Roadway and Security Solutions 0400E 9001 Rev J...

Page 16: ...prevent accidental operation of the motor if power resumes during the use of the Manual Override Tool Do not position any part of your body in the pathway of moving 1 Locate the electric Drive Motor u...

Page 17: ...nd LOCK PIN UP input is activated on the PLC 8 Manually open the gate by to see if the problem is mechanical or electrical If mechanical check for binding on the gate Gate makes noise during operation...

Page 18: ...ecurity Solutions 0400E 9001 Rev J 6 REFERENCE DRAWINGS The following drawings are provided for reference only For job specific drawings and details please refer to the Submittal Documentation specifi...

Page 19: ...odel 400E Series 21 B B ARMR A Division of B B Roadway and Security Solutions 0400E 9001 Rev J B B ARMR 2009 Chenault Dr 114 Carrollton Tx 75006 800 367 0387 GENERIC 400 CANTILEVER SLIDING GATE 20 RIG...

Page 20: ...Operations Manual Model 400E Series 22 B B ARMR A Division of B B Roadway and Security Solutions 0400E 9001 Rev J B B ARMR 2009 Chenault Dr 114 Carrollton Tx 75006 800 367 0387 400 CRASH BEAM LEFT HA...

Page 21: ...ns Manual Model 400E Series 23 B B ARMR A Division of B B Roadway and Security Solutions 0400E 9001 Rev J B B ARMR 2009 Chenault Dr 114 Carrollton Tx 75006 800 367 0387 450A CANTILEVER SLIDING GATE 20...

Page 22: ...rations Manual Model 400E Series 24 B B ARMR A Division of B B Roadway and Security Solutions 0400E 9001 Rev J 400 SERIES CANTILEVER SLIDING GATE FOUNDATIONS B B ARMR 2009 Chenault Dr 114 Carrollton T...

Page 23: ...Installation and Operations Manual Model 400E Series 25 B B ARMR A Division of B B Roadway and Security Solutions 0400E 9001 Rev J TYPICAL ELECTRICAL 450E SHOWN...

Page 24: ...ted to unauthorized repairs improper installation installation not performed by BBRSS authorized personnel incoming supply power is outside the tolerance for the product failure to perform manufacture...