UHD L
OW
P
ROFILE
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
24 of 47
10.4 UHD[X][S] Series Ladder Wirin
g
Dia
g
ram
IMPORTANT:
For field
w
iring into service j
u
nction box, or if any of the original
w
ire s
u
pplied
w
ith the heater
m
u
st be replaced, it m
u
st be replaced
w
ith
w
iring material having a temperat
u
re rating of at least 105° C
(221° F) and 600
V
. For s
u
pply connections,
u
se No. 14 AWG or larger
w
ires.
FLAME
SENSOR
PRESSURE SWITCH
THERMOSTAT CONNECTION
6
3
4
5
2 1
120 VAC
TRANSFORMER
FLUE BLOWER
GAS VALVE
ELECTRODE
IGNITION
MODULE
FLAME
SPARK
LIMIT SWITCH
LIMIT SWITCH (UHD 300, 350, 400 ONLY)
MANUAL RESET LIMIT SWITCH
(UHD 75 ONLY)
FLUE BLOWER
Summary of Contents for UHD 75
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 29: ...SECTION 9 GAS PIPING 21 of 47 Figure 14 Gas Connection...
Page 43: ...SECTION 14 TROUBLESHOOTING 35 of 47 14 1 General...
Page 54: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 46 of 47...
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......