UHD L
OW
P
ROFILE
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
32 of 47
13.7 Maintenance Checklist
Installation Code and Annual Inspections:
All installation and service of BANANZA
®
eq
u
ipment
m
u
st be performed by a contractor q
u
alified in the
installation and service of eq
u
ipment sold and
s
u
pplied by Bananza and conform to all
req
u
irements set forth in the BANANZA
®
man
u
als
and all applicable governmental a
u
thorities
pertaining to the installation, service, operation and
labeling of the eq
u
ipment.
To help facilitate optim
u
m performance and safety,
Bananza recommends that a q
u
alified contractor
cond
u
ct, at a minim
u
m, ann
u
al inspections of yo
u
r
BANANZA
®
eq
u
ipment and perform service
w
here
necessary,
u
sing only replacement parts sold and
s
u
pplied by Bananza.
Annual Fall Start-up
Follo
w
entire start-
u
p proced
u
re at this time and check control settings and
operation.
The Vicinity of the Heater
Do not store or
u
se flammable objects, liq
u
ids or vapors near the heater.
Immediately remove these items if they are present.
See Page 5, Section 3
.
Vehicles and Other
Objects
Maintain the clearances to comb
u
stibles.
Do not hang anything from, or place anything on, the heater.
Make s
u
re nothing is lodged in bet
w
een the heat exchanger t
u
bes.
Immediately remove objects in violation of the clearances to comb
u
stibles.
See Page 6, Section 4
.
Vent Pipe/Terminals
V
enting m
u
st be intact. Using a flashlight, look for obstr
u
ctions, cracks on the
pipe, gaps in the sealed areas or corrosion.
The area m
u
st be free of dirt and d
u
st.
Remove any carbon deposits or scale
u
sing a
w
ire br
u
sh.
If the vent terminal has a screen b
u
ilt in, remove any dirt, d
u
st or deposits
from the screen.
See Page 19, Section 8
.
Cabinet Exterior
After installation, to
u
ch
u
p scratches. Periodic painting sho
u
ld be done there-
after as req
u
ired. Warning labels and logo labels sho
u
ld be legible and acc
u
-
rate. Please contact Bananza or BANANZA
®
independant distrib
u
tor if yo
u
need replacement
w
arning labels or logo labels.
See Page 2, Figure 1
through Page 3, Figure 2
Summary of Contents for UHD 75
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 29: ...SECTION 9 GAS PIPING 21 of 47 Figure 14 Gas Connection...
Page 43: ...SECTION 14 TROUBLESHOOTING 35 of 47 14 1 General...
Page 54: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 46 of 47...
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......