BURNER CONNECTION TO THE BOILER
ASSEMBLING THE HEAD UNIT
•
Position insulating seal -13 on the sleeve, placing rope -2 between
the flange and the seal.
•
Adjust the connection flange -19 position loosening the screws -6.
The burner head must penetrate to the extent requested by the
generator manufacturer.
•
Anchor the the head unit to the boiler -1 using the stud bolts,
washers and nuts provided -7.
DANGER / CAUTION
Completely seal the gap between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.
ASSEMBLING THE GAS TRAIN
The gas train can be assembled in different ways: -1, -2, -3 , of the
gas train.
The burner is supplied by the gas train connection facing downward.
If you wish to invert the direction of train entrance to allow the gas train
to be assembled in configuration (1), follow the procedure described
in the section entitled: "Preparation for connection with train turned
upward".
Choose the most rational position for the set-up of the boiler room and
the position in which the gas pipeline arrives.
0002935610
19
2
1
7
6
13
0002936660
1
2
3
Summary of Contents for TBG 45 ME
Page 2: ......
Page 32: ...ITALIANO 30 34 0006081532_201711 SCHEMI ELETTRICI...
Page 33: ...ITALIANO 31 34 0006081532_201711...
Page 34: ...ITALIANO 32 34 0006081532_201711...
Page 36: ......
Page 66: ...ENGLISH 30 34 0006081532_201711 WIRING DIAGRAMS...
Page 67: ...ENGLISH 31 34 0006081532_201711...
Page 68: ...ENGLISH 32 34 0006081532_201711...
Page 70: ......
Page 71: ......