ENGLISH
18 / 42
0006160278_201804
QUICK GUIDE FOR ADJUSTING THE RPM VALUE FOR IGNITION LOAD (P0),
MINIMUM LOAD (P1) AND NOMINAL LOAD (P2)
ADJUSTMENTS
Press and hold button
together with button
and
for more than 5 seconds (flashing OFF is displayed)
Activate heat request (switch on the furnace by increasing the
temperature) within 30 seconds
DISPLAY
DisplayLME71_012
Activate heat request by powering, only and exclusively,
T1 contact of X1S 7-pole connector through TC boiler thermostat
(see figure on the side)
Do not power T2 contact for the second stage burner,
otherwise it will not be possible to complete the adjustment of P1
minimum load and P2 maximum load.
DisplayLME71_31
LME71 starts the start-up sequence
DisplayLME71_001
(Stabilisation time)
DisplayLME71_001
(Pre-ventilation time)
The program continues in the ignition load position P0
DisplayLME71_015
DisplayLME71_016
(Rpm x 10)
To reduce the rpm value press
and
To increase the rpm value press
and
To confirm the modification in the internal memory and/or continue the start-up sequence press