4
To Assemble:
Identify and Separate all the Parts and Hardware.
Install 2 each Cam Posts (C2) in the 2 threaded
insert nuts in the Top Panel (P5)
as shown in illustration #1.
Illustration # 1
C1
1.
2.
4.
P-5
#27541
Mobile Laptop Charging Station
Assembly Diagram
C2
Be sure that arrow on
top of Camlock (C1)
aligns with centerline
of Edge Drilled hole.
Phillips
Screwdriver
Centerline
of Edge
Drilled hole.
Arrow
Install 2 Cam Locks (C1) into the 2
large holes in the Middle Panel (P4) as
shown in illustration #2
Illustration # 2
P-4
The Balt product you have purchased is guaranteed against material and workmanship defects. This
guarantee extends 1 year from date of purchase. Should this product fail to function satisfactorily under
normal use due to defect or imperfection, the defective part or product will be replaced. Damage caused
by common carriers during shipment is not included in this guarantee.
This guarantee sets forth all applicable guarantees and remedies. No other warranty, expressed
or implied shall apply. Failure to follow instructions found in Important Information Section of
Owner Sheet shall void the guarantee. Consequential or incidental damages and or costs are not
refundable.
Important
G
Install 1 Wood Dowel (G)
in the hole in the middle of the
Top Panel (P5)
3.