![Balmar ARS-5-H Installation And Operation Manual Download Page 1](http://html1.mh-extra.com/html/balmar/ars-5-h/ars-5-h_installation-and-operation-manual_3591445001.webp)
1
www.balmar.net / Customer Service: +1 (360) 435-6100 x1 / Technical Support: +1 (360) 435-6100 x3
Tech Service is available Monday - Friday (8:30am - 7:30pm EST)
INSTALLATION AND OPERATION MANUAL
Introduction
The Balmar ARS-5
provides precise voltage control for Balmar
high-output 12-volt alternators and other externally regulated
P-type (positive field) alternators, the ARS-5 features user
selectable programs for the following battery types: Deep cycle
flooded, gel, AGM and spiral wound (Optima) batteries.
In addition, the regulator features a universal default (UFP)
program that’s safe for most battery types.
In addition to the user selectable preset programs, the
ARS-5 features a wealth of advanced programming modes
which make it possible to tailor charging to a wide variety of
environments and battery types
When used in conjunction with optional MC-TS-A and MCTS-B
alternator and battery temperature sensors, the ARS-5 features
the ability to monitor and respond to a range of ambient
temperature conditions, including reduction or discontinuation
of charging voltages, should a catastrophic over-temperature
condition occur at the alternator or the batteries.
Safety Considerations
1.
Always disconnect your battery banks and
ensure that switches are “OFF” prior to
installing your regulator.
2.
Remove loose-fitting clothing or jewelry,
which could become entangled in your
motor or other machinery prior to installing
regulator.
3.
Wear ANSI-approved safety eye-wear and
protective gear.
4.
DO NOT attempt to modify the regulator.
Modifications could result in damage to
your charging system, and will void your
warranty.
5.
DO NOT attempt installation if you are tired
or fatigued.
6.
Ensure that the engine has cooled before
initiating installation.
7.
DO NOT attempt regulator installation while
using alcohol or medication that could
impair your judgment or reaction time.
8.
Always use the right tool for the job.
Improper tool use may damage regulator
or your vessel, and could result in personal
injury.
9.
Take time to read the manual. Equipment
damage and possible injuries may result
from an incomplete understanding of the
installation and operation of the MC-612-
DUAL regulator. If you are unfamiliar with
marine electrical systems, consult with a
licensed marine electrician.
©201
9
Balmar LLC SUP-0203 REV.
C
11/6/19
Introduction
1 Regulator Programming
11
Safety Considerations
1 Basic Programming
12
Regulator Installation
2 Adjust For Battery Type
12
Unpacking Box
2 Belt Load Manager
13
Locate/Mount Regulator
2 Dash Lamp Source
10
Basic Wiring Installation
2 Advanced Programming
14
LiFePO
4
3 Unlock Adv. Programming
14
Regulator Terminal Layout
4 Adjust Adv. Programming 11-12
Installation By Wire
5-7 Default Program Settings
12
Initial Start Up
7 Battery Equalization
12
Regulator Operation
8 Add’l. Regulator Features
16
Regulator Display Modes
9 Troubleshooting
13-15
Using Magnetic Tool
12 Warranty
16
Table of Contents
ARS-5
MULTI-STAGE
VOLTAGE REGULATOR