
16
8. Repeat step 7 to secure the last stand. You
should get the following (Fig. 21);
9. Tighten all bolts with a wrench;
10. Reinstall the side and main covers. Tighten the
screws that secure the side covers. Assembly
is complete (Fig. 22).
8. Control
IMPORTANT!
• Before the first start-up of the
device, it is necessary to release
a part of the gas-air mixture from
the gas cylinder by opening the
valve for 5-10 seconds. Perform
strictly in a well-ventilated area!
The air contained in the cylinder
forms a mixture with gas vapors,
which, when entering the burner,
will be unstable. For correct
operation of the instrument, after
filling the cylinder, it is necessary
Fig. 21
Fig. 20
Fig. 22
Summary of Contents for BOGH-15
Page 23: ......
Page 24: ...www ballu ru Importer ...