PAGE 4
20.00 DIAMETER
48.00
REBAR # 40
16.00 DIAMETER
CONCRETE
COURT LEVEL
FIGURE 1
AEB ANCHOR SYSTEM INSTALLATION
STEP 1 - CONTINUED
The upper set of (#3) nuts and (#4) washers can be hand threaded onto the (#2) L-Bolts to prevent them from being lost.
•
Thread the 1st (#3) nut onto each of the four (#2) L-Bolts
leaving 3” of the thread exposed above the (#3) nut as
illustrated in Image 2.
•
Insert each (#2) L-Bolt into the (#1) template and secure
with (#3) nuts as shown in Image 1 on the previous page.
Tighten the top (#3) nut to prevent the bolts from moving.
•
The remaining hardware is not necessary at this point and
can be placed on the (#2) L-Bolts above the (#1) template to
prevent them from being lost.
STEP 2 - DIG THE HOLE
•
Before you dig confirm that all underground utilities have
been marked and that you understand the markings.
•
Irrigation lines, invisible fence wires etc. are not considered
an underground utility and will not be marked by the (811)
technician.
•
Determine your hole location keeping in mind the overhang
of the backboard in relationship to the face of the pole and
the overall playing area of your driveway or slab.
•
Dig a square hole that measures at least 48” deep with
a diameter of at least 16 inches and is square with the
driveway/slab and/or playing area. *Keep in mind the top of
the anchor (#1) template should be set level with the playing
surface to ensure the rim will reach the regulation 10’ playing
height.
Note:
A cardboard concrete form or one constructed out of 2 x 4
lumber is recommended for the top 4” of the hole as it provides a
nice finished product, aids in squaring the anchor system with the
driveway/slab and/or playing area and provides a reference point
for the top of the template in relationship to the playing surface.
NOTE:
ALLOW 3" OF THREAD
ABOVE 1st NUT
LOCATED BELOW
TEMPLETE AS
SHOWN
DETAIL# 18
ASSEMBLING
GROUND KIT
2
33
44
3
1
5
TEMPLETE
1st-NUT
HARDWARE IS THE SAME
FOR ALL FOUR SIDES
NUMBERED AS SHOWN.
Image 2
Image 3