background image

Template  40941_J  04-02-10

56281/56282/56283_97_A  02-01-13

4

Manufactured under one or more of these patents.  U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417,834 b2,
Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending.   All material copyright of Balboa Water Group.

Power Requirements:

Single Service 

[3 wires (line, neutral, ground)]

230VAC, 50Hz, 1þ, 32A, (Circuit Breaker rating = 40A max.)

System Ouputs - 32A Service:

Pump 1 

230VAC 

2-Speed 

12A max 

30-minute timer for Low Speed, 15 Minutes for High Speed

 

This is the heater pump 

 

Must deliver a minimum of 20 GPM through heater

Pump 2 

230VAC 

1-Speed 

12A max 

15-minute timer

Ozone 

230VAC 

 

.5A max 

Uses the same relay as Pump 1 Low

Spa Light 

10VAC 

On/Off 

1A max 

4-Hour timer. 

Heater 

3kW @ 240VAC

Misc. 

J2 & J32 

230VAC 

4A max 

Hot output (Stereo). Fused equipment or in-line fuse required.

Wiring Diagram and Settings 

Setup 1-32 

J15: SPA LIGHT 

BELEUCHTUNG  

ECLAIRAGE BAIN HYDRO  

10VAC 1A 

 

 

 

 

WS01CE

FOR SUPPLY CONNECTIONS, 

USE CONDUCTORS SIZED ON THE 

BASIS OF 60°C AMPACITY BUT 

RATED MINIMUM OF 90°C.
TORQUE RANGE FOR MAIN TERMINAL BLOCK (TB1): 

27-30 IN. LBS. (31.1-34.5 kg cm)

USE COPPER CONDUCTORS ONLY

EMPLOYER UNIQUEMENT 

DES CONDUCTEURS DE CUIVRE. 

L2

L1

N

F3 10A 250V

F2 3A 250V

T 150mA 

250V

F6

J44
J48

J1
J2

J24

J45

J49

J15

J16

J47

J13

J27 J25 J26 J23 J33

J28 J30 J31 J32 J29

J12

J46

J20

J57

J8

J14

J22

J21

J56

F5 T 30A 

GND

K3

K5

K6

K2

K1

K4

OZONE

22117_B

RED AC

GND

GND

WHT AC

HTR A

HTR B

UNFUSED

CONTROL PANEL

TO J33

AUX

TO J5

S1

J45

J46

F4 3A 250V

J18

J19

K7

T1

J15

J33

J31 HCE

J30 TST

J27

H3

J22

J26 H2

J25 H1

J17
J16

J29 VAC

J28 AUX FRZ

J5

LIGHT

ON

22121_E

1

6

ALL UNUSED SWITCHES SHOULD BE OFF

STORE SETTINGS*
SPECIAL AMPERAGE RULE OFF
DON’T ADD 4 HS PUMPS W/HTR
DON’T ADD 2 HS PUMPS W/HTR
DON’T ADD 1 HS PUMP W/HTR
TEST MODE OFF

MEMORY RESET*
SPECIAL AMPERAGE RULE ON
ADD 4 HS PUMPS WITH HEAT
ADD 2 HS PUMPS WITH HEAT
ADD 1 HS PUMP WITH HEAT
TEST MODE ON 

6

5

4

3

2

1

ON POSITION  

S1 SWITCH #

OFF POSITION

*SWITCH # 

6

 SHOULD BE SET TO OFF 

 UPON FINAL INSTALLATION.

SENSOR A

SENSOR B

NOT USED

2S PUMP 1

1S PUMP 2

GRN

3.0 kW

HEATER

HEIZELEMENT

RADIATEUR

N

L1

N/A

ADDED JUMPER FOR

CE INSTALLATIONS

BLU

BRN

Confi guration Changes based on Default

Feature 

Orig. Setup 1 

Changes to

J2 & J32  . . . . . . . . . . . . . . . . . . . . . . . Hot Output . . . . . . . . . . .

Useable

DIP Switch Option 

Orig. Setup 1 

Changes to

Add 1 High Speed Pump with Heat . . . . . . DIP Switch 2 OFF . . . . . . .

DIP Switch 2 ON 

Summary of Contents for BP600

Page 1: ...3kW 800 Incoloy Heater Element 56282 3kW 825 Incoloy Heater Element 56283 3kW Titanium Heater Element CE System Model BP16 BP600 RCA 3 0KW Software ID M100_205 V6 Software Version 6 0 Hex File BP1600_...

Page 2: ...s hot hot optional neutral ground H 240VAC 60Hz 32A Class A GFCI protected service Circuit Breaker 40A max 4 wires hot hot neutral ground F 120VAC 60Hz 16A Class A GFCI protected service Circuit Break...

Page 3: ...BLOCK TB1 27 30 IN LBS 31 1 34 5 kg cm USE COPPER CONDUCTORS ONLY EMPLOYER UNIQUEMENT DES CONDUCTEURS DE CUIVRE L2 L1 N F3 10A 250V F2 3A 250V T 150mA 250V F6 J44 J48 J1 J2 J24 J45 J49 J15 J16 J47 J1...

Page 4: ...IMUM OF 90 C TORQUE RANGE FOR MAIN TERMINAL BLOCK TB1 27 30 IN LBS 31 1 34 5 kg cm USE COPPER CONDUCTORS ONLY EMPLOYER UNIQUEMENT DES CONDUCTEURS DE CUIVRE L2 L1 N F3 10A 250V F2 3A 250V T 150mA 250V...

Page 5: ...the original Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED WS02CE FOR SUPPLY CONNECTIONS USE CONDUCTORS SIZED ON THE BASIS OF 60 C AMPACITY BUT RATED MINIMUM OF 90 C TOR...

Page 6: ...on Add 1 High Speed Pump with Heat DIP Switch 2 OFF DIP Switch 2 ON Blue indicates changes from the original Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED WS02CE FOR SUP...

Page 7: ...nal Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED WS03CE FOR SUPPLY CONNECTIONS USE CONDUCTORS SIZED ON THE BASIS OF 60 C AMPACITY BUT RATED MINIMUM OF 90 C TORQUE RANGE...

Page 8: ...with Heat DIP Switch 2 OFF DIP Switch 2 ON Blue indicates changes from the original Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED WS03CE FOR SUPPLY CONNECTIONS USE COND...

Page 9: ...d Blue indicates changes from the original Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED WS04CE FOR SUPPLY CONNECTIONS USE CONDUCTORS SIZED ON THE BASIS OF 60 C AMPACITY...

Page 10: ...Not Used non circ Circ Pump Enabled J2 J32 Hot Output Useable Blue indicates changes from the original Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED WS04CE FOR SUPPLY C...

Page 11: ...lt J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED WS05CE FOR SUPPLY CONNECTIONS USE CONDUCTORS SIZED ON THE BASIS OF 60 C AMPACITY BUT RATED MINIMUM OF 90 C TORQUE RANGE FOR MAIN TERMINA...

Page 12: ...ot Output Useable Blue indicates changes from the original Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED FOR SUPPLY CONNECTIONS USE CONDUCTORS SIZED ON THE BASIS OF 60 C...

Page 13: ...s from the original Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED WS06CE FOR SUPPLY CONNECTIONS USE CONDUCTORS SIZED ON THE BASIS OF 60 C AMPACITY BUT RATED MINIMUM OF 9...

Page 14: ...on Add 1 High Speed Pump with Heat DIP Switch 2 OFF DIP Switch 2 ON Blue indicates changes from the original Setup 1 default J15 SPA LIGHT BELEUCHTUNG ECLAIRAGE BAIN HYDRO 10VAC 25A LED FOR SUPPLY CON...

Page 15: ...will enter Test Mode Moving DIP Switch 1 to OFF will exit Test Mode Read and understand these instructions before beginning this process Know the Setup Number you want before you power up the spa and...

Page 16: ...nually exit Priming Mode Immediately after exiting Priming Mode press this sequence of buttons Warm Light Warm Warm Warm Warm Continue to press Warm until the diplay shows the Setup Number S 01 S 02 e...

Page 17: ...wer and heater runs on service line L1 with L2 acting as the return 230VAC Set the DIP switches according to the wiring diagram so that total system current draw never exceeds the rated service input...

Page 18: ...s etc Requires a single speed P1 Cleanup Cycle 30 Minutes Between 30 and 240 minutes 30 Minutes or OFF Cleaup as Preference setting Yes Yes No N A Ozone With Heater Pump Always Filters Cleanup Only N...

Page 19: ...Default Temp 70 F Between 50 and 99 F 1 F Freeze Threshold 44 F Between 39 and 54 F 1 F Temp Lock Type Temp Settings Temp Temp Settings N A Time Features Feature Default Options Increment Time Format...

Page 20: ...number of pumps selected is reached No Limitation does not restrict pump or blower operation DIP Switch 5 is used to choose Special Amperage Rule 1 or 2 Drain Mode Disabled Disabled Enabled N A Demo M...

Page 21: ...s 3 Jets 4 Jets 5 Jets 6 Jets 7 Jets 8 Blower 1 Blower 2 Mister 1 Mister 2 Mister 3 Light 1 Light 2 Light 3 Light 4 Fiber Optic Option 1 Option 2 Option 3 Option 4 EitherLight Configuration Options TP...

Page 22: ...ons Unused Heat On Filter Cycle On Lock Jets 1 Jets 2 Jets 3 Jets 4 Jets 5 Jets 6 Jets 7 Jets 8 Blower 1 Blower 2 Mister 1 Mister 2 Mister 3 Light 1 Light 2 Light 3 Light 4 Fiber Optic Option 1 Option...

Page 23: ...Down Temp Jets 1 Jets 2 Jets 3 Jets 4 Jets 5 Jets 6 Jets 7 Jets 8 Blower 1 Blower 2 Mister 1 Mister 2 Mister 3 Light 1 Light 2 Light 3 Light 4 Fiber Optic Option 1 Option 2 Option 3 Option 4 EitherLig...

Reviews: