14
Figure 12: Rear of gas controller
Use the blue hose to connect N
2
on the Gas Controller to the N
2
gas cylinder and the black hose to
connect CO
2
on the Gas Controller to the CO
2
cylinder.
Connect the mains lead to the right port shown on Gas Controller.
Open gas cylinders and turn the gas controller power on.
For installation inside a workstation (SCI-tive or InvivO
2
) or CO
2
Incubator
Place Cell Culture Chamber in desired Workstation or Incubator.
Place the Gas Controller adjacent to the Workstation or Incubator.
Locate Universal Multi-Cable Gland on left side panel of Workstation or Incubator.
Figure 13: Outside view of InvivO
2
showing Universal Multi-Cable Gland