
© 2017 Baker Hughes, a GE company, LLC. All rights reserved.
36
|
BHGE
Pre-Installation Issues
Storage
If the SVI II AP is stored for a long duration, you must keep the housing sealed against weather,
fluids, particles, and insects. To prevent damage to the SVI II AP:
Use the plugs provided with shipment to plug the ¼ NPT air connections, on the
positioner and on the air filter regulator set.
Do not allow standing water to accumulate.
Observe storage temperature requirements.
Unpacking
Exercise care when unpacking the control valve and its mounted accessories.
Installation Steps
If you experience problems that are not documented in this guide call the factory or your local
representative. Sales offices are listed on the last page of this document.
Compliance voltage testing is best done before installation. See “Determining an SVI
Positioner Compliance Voltage in a Control System” on page 199.
The steps necessary to complete the SVI II AP installation and software setup are outlined in
Table 4.
Table 4 SVI II AP Installation Steps
Step No.
Procedure
Reference
1
Attach mounting bracket to the actuator.
See page 39 for rotary valve and page 44
for reciprocating valve instructions.
2
Install the SVI II AP magnetic assembly (rotary valves
only).
See page 43 for instructions.
3
Assemble the SVI II AP on the bracket that is mounted to
the valve actuator.
See page 39 for rotary valve and page 44
for reciprocating valve instructions.
4
Install the Remote Position Sensor, if necessary.
See
GEA31195 Masoneilan Valve Solutions
Remote Sensor Quick Start
for instruc-
tions.
5
Connect the pneumatic tubing to the SVI II AP.
Natural gas installation considerations.
See page 51 for instructions.
See“Installing an SVI II AP in a Natural Gas
Environment” on page 167 for instruc-
tions.
Summary of Contents for Masoneilan SVIII AP
Page 10: ...This page intentionally left blank...
Page 14: ...This page intentionally left blank...
Page 18: ...This page intentionally left blank...
Page 58: ...This page intentionally left blank...
Page 68: ...This page intentionally left blank...
Page 104: ...This page intentionally left blank...
Page 122: ...This page intentionally left blank...
Page 128: ...This page intentionally left blank...
Page 148: ...This page intentionally left blank...
Page 158: ...2017 Baker Hughes a GE company LLC All rights reserved 158 BHGE Spare Parts...
Page 160: ...2017 Baker Hughes a GE company LLC All rights reserved 160 BHGE...
Page 162: ...This page intentionally left blank...
Page 166: ...This page intentionally left blank...
Page 172: ...This page intentionally left blank...
Page 174: ...This page intentionally left blank...
Page 176: ...This page intentionally left blank...
Page 180: ...This page intentionally left blank...
Page 188: ...This page intentionally left blank...
Page 190: ...This page intentionally left blank...
Page 203: ......