I/P Module Installation
To install I
⁄
P module:
1. Place the module in the designated area on the positioner.
2. Using a 3 mm hex key, install the four screws around the perimeter of the I
⁄
P module.
3. Replace the I/P wire connector on the terminal board.
4. Replace the Display Cover (see “Installing the SVI II AP Display Cover” on page 140).
Ensure that:
The wire is not damaged when feeding it through the housing.
A single O-ring is in place on the wire-sleeve and is not damaged.
The four retaining screws are tight and torque to 15 in-lb (1.7 N-m).
Inserting the wire sleeve through the housing does not require force.
Pneumatic Cover Installation
To install the pneumatic cover:
1. Place the cover over the pneumatic module.
2. Using a 3 mm hex key, install the six screws around the perimeter of the cover and torque
to 8 in-lb (.9 N-m).
Relay Removal and Installation
To remove the pneumatic relay:
1. Using a 3 mm hex key, remove the three screws from around the perimeter of the relay.
2. Lift the relay off the positioner.
Relay Installation
1. Place the relay in the designated area on the positioner.
2. Using a 3 mm hex key, install the three screws around the perimeter of the relay.
Ensure that:
1. The five O-rings are seated in the base of the relay and are not damaged.
2. The three mounting screws are tight and torque to 15 in-lb (1.7 N-m).
NOTE
When you have completed maintenance on the pneumatic relay it
is necessary to reinstall the pneumatic cover. Refer to on
“Pneumatic Cover Installation” on page 143.
Summary of Contents for Masoneilan SVIII AP
Page 10: ...This page intentionally left blank...
Page 14: ...This page intentionally left blank...
Page 18: ...This page intentionally left blank...
Page 58: ...This page intentionally left blank...
Page 68: ...This page intentionally left blank...
Page 104: ...This page intentionally left blank...
Page 122: ...This page intentionally left blank...
Page 128: ...This page intentionally left blank...
Page 148: ...This page intentionally left blank...
Page 158: ...2017 Baker Hughes a GE company LLC All rights reserved 158 BHGE Spare Parts...
Page 160: ...2017 Baker Hughes a GE company LLC All rights reserved 160 BHGE...
Page 162: ...This page intentionally left blank...
Page 166: ...This page intentionally left blank...
Page 172: ...This page intentionally left blank...
Page 174: ...This page intentionally left blank...
Page 176: ...This page intentionally left blank...
Page 180: ...This page intentionally left blank...
Page 188: ...This page intentionally left blank...
Page 190: ...This page intentionally left blank...
Page 203: ......