16 | Baker Hughes
Copyright 2021 Baker Hughes Company. All rights reserved.
Figure 12
Figure 13
Type 51/52/53 Cylinder Actuators
Connecting Double Acting (Model 51)
(Figures 14 & 15)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the Top Plate (17).
3. Apply required air pressure through the manual loading
panel to completely extend the actuator stem.
4. Reconnect manual loading panel tubing from the Top Plate
(17) to the Yoke (1), which is integrated into the bottom
plate connection.
5. Retract the actuator stem either pneumatically or with a
handwheel approximately .1" (2mm) using the visual stroke
scale as shown in Figure 12.
6. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both
stems, then retract the actuator stem until alignment and
engagement is achieved.
7. Assemble and tighten Indicator Arm (23), Spring Lock Washers
(25), and Hexagon Bolts (24).
8. Line up the indicator plate (26), with Indicator arm (23) and
check actuator for proper operation.
Connecting Air to Extend (Model 52) (Figure 16)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the top plate (17).
3. Apply required air pressure through the manual loading
panel to completely extend the actuator stem.
4. Extend the actuator stem either pneumatically or with a
handwheel approximately .1" (2mm) using the visual stroke
scale as shown in Figure 12.
5. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both
stems, then extend the actuator stem until alignment and
engagement is achieved.
6. Assemble and tighten Indicator Arm (23), Spring Lock
Washers (25), and Hexagon Bolts (24).
7. Line up the indicator plate (26), with Indicator arm (23) and
check actuator for proper operation.
Connecting Air to Retract (Model 53) (Figure 17)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the yoke (1), which
is integrated into the bottom plate connection.
3. Retract the actuator stem either pneumatically or with a
handwheel approximately .1" (2mm) using the visual stroke
scale as shown in Figure 12.
4. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both stems,
retract the actuator stem until alignment and engagement
is achieved.
5. Assemble and tighten Indicator Arm (23), Spring Lock
Washers (25), and Hexagon Bolts (24).
6. Line up the indicator plate (26), with Indicator arm (23) and
check actuator for proper operation.
Make sure the valve is fully extended.
Make sure the valve is fully extended.
Make sure the valve is fully extended.