Masoneilan 21000 Series Top Guided Globe Valve Instruction Manual | 23
Copyright 2023 Baker Hughes Company. All rights reserved.
Type 51/52/53 Cylinder Actuators
Connecting Double Acting (Model 51) (Figures 24 & 25)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the Top Plate (17).
3. Apply required air pressure through the manual loading panel
to completely extend the actuator stem.
4. Reconnect manual loading panel tubing from the Top Plate
(17) to the Yoke (1), which is integrated into the bottom plate
connection.
5. Retract the actuator stem either pneumatically or with a
handwheel approximately .1” (2mm) using the visual stroke
scale as shown in Figure 21.
Figure 21
6. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both
stems, then retract the actuator stem until alignment and
engagement is achieved.
Make sure the valve is fully extended.
Figure 22
7. Assemble and tighten Indicator Arm (23), Spring Lock
Washers (25), and Hexagon Bolts (24).
8. Line up the indicator plate (26), with Indicator arm (23) and
check actuator for proper operation.
Connecting Air to Extend (Model 52) (Figure 26)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the top plate (17).
3. Apply required air pressure through the manual loading panel
to completely extend the actuator stem.
4. Extend the actuator stem either pneumatically or with a
handwheel approximately .1” (2mm) using the visual stroke
scale as shown in Figure 21.
5. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both stems,
then extend the actuator stem until alignment and
engagement is achieved.
Make sure the valve is fully extended.
6. Assemble and tighten Indicator Arm (23), Spring Lock
Washers (25), and Hexagon Bolts (24).
7. Line up the indicator plate (26), with Indicator arm (23) and
check actuator for proper operation.
Connecting Air to Retract (Model 53) (Figure 27)
1. Install actuator on the valve body with drive nut.
2. Connect manual loading panel tubing to the yoke (1), which
is integrated into the bottom plate connection.
3. Retract the actuator stem either pneumatically or with a
handwheel approximately .1” (2mm) using the visual stroke
scale as shown in Figure 21.
4. Assemble the Split Clamp (22).
Note: If the split clamp does not engage with both stems,
retract the actuator stem until alignment and engagement
is achieved.
Make sure the valve is fully extended.
5. Assemble and tighten Indicator Arm (23), Spring Lock
Washers (25), and Hexagon Bolts (24).
6. Line up the indicator plate (26), with Indicator arm (23) and
check actuator for proper operation.