
BAK Thermoplastic Welding Technology Ltd
7
•
Guide the welding machine along the overlapping. Always watch the position of the
guide roller.
•
After welding lower and raise the hot air tool.
•
Turn off the heating with the switch on the hot air tool and allow the welding nozzle to
cool down.
•
Switch off the tool with the main switch.
MOUNTING
!!!ATTENTION!!!
ALWAYS unplug the tool before mounting on the tool!!!
1.0. Change of the heating element:
1.1.
Swivel out and lock the hot air tool
1.2.
Loosen four screws at the flange of the nozzle
1.3.
Draw off the nozzle
1.4.
Draw off the mica tube (be careful – fragile)
1.5.
Demount the gasket
1.6.
Draw off the broken heating element
1.7.
Insert the new heating element – watch the marking
1.8.
Mount the mica tube
1.9.
Slide on the gasket, position the boreholes
1.10.
Slide on the nozzle and affix with 4 screws
1.11.
Readjust the nozzle, as described above
2.0. Adjustment of the welding seam width to 20 / 30 / 40 mm: attachment accessory no. 2 -
PlanOn
3.0. Mounting of the hem kit: attachment accessory no. 3 - PlanOn
4.0. Mounting of the keder accessories/kit: attachment accessory no. 4 - PlanOn
5.0. Mounting of the tape welding accessories/kit: attachment accessory no. 5 - PlanOn
6.0. Mounting of the vandalism kit: attachment accessory no. 6 – PlanOn
7.0. Mounting of the additional weight: attachment accessory no. 7 – PlanOn
!!! THE INSTALLATION INSTRUCTIONS 2.0. to 7.0. ARE ENCLOSED WITH THE
ACCESSORIES !!!
ACCESSORIES
Get the best result by using BAK-accessories and spare parts.
Further information can be found in our brochures.