INTRODUCTION
I-E96-418A
3 - 1
SECTION 3 - MAINTENANCE
INTRODUCTION
The plant loop termination unit requires minimal mainte-
nance. Doing the tasks in Table
free service. Please note that only qualified personnel should
perform maintenance.
MAINTENANCE SCHEDULE
Table
is the maintenance schedule. These tasks are to be
performed at the specified intervals.
Table 3-1. Maintenance Schedule
Task
Interval
Clean and tighten all cable and
power connections.
Every 6 months or during plant
shutdown, whichever occurs first.
Use a static safe vacuum cleaner
to remove dust from:
Termination units
Field termination panel