INSTALLATION

CABLE INSTALLATION

2 - 4

  

I-E96-418A

®

Communication Cable

The communication cable connects the TPL to Plant Loop.
Table 

2-1

 contains information about the connector assign-

ments and length restrictions of the communication cable. To
install the communication cable, connect the cable to the ter-
mination unit at the terminal blocks, TB1 or TB2. Figure 

2-3

shows the TPL terminal assignments. Figure 

2-4

 shows how

the leads of the NKPL01/02 cable must be connected to the
TPL terminals. 

Figure 2-3.  TPL Twinaxial Cable Terminal Assignments

NOTE: If the black band that identifies the (+) lead of the cable is
removed, you can identify that lead by looking for one tined strand
of wire within the stranded conductors of that lead.

Figure 2-4.  NKPL01/02 Lead Assignments

SOCKET P1 FOR

NKLM01 CABLE

TO NLIM02 LOOP

INTERFACE

MODULE

LOOP OUTPUT 2

LOOP INPUT 2

TERMINAL BLOCKS

(TB1-TB2)

TERMINAL 1

LOOP
OUTPUT 1

LOOP
INPUT 1

1

1

+

+

2

2

7

7

SHIELD

SHIELD

6

6

5

5

+

+

4

4

NOT USED

NOT USED

3

3

SHIELD

SHIELD

8

8

NOT USED

NOT USED

TB1

TB2

P1

NTPL01

CHASSIS
GROUND

T00600A

E2

COMMON

E1

+24 VDC

NKPL01/02

BLACK
BAND

GREEN

WIRE

T00601A

8

7

6

5

4

3

2

1

NOT

USED

SHD

+

NOT

USED

SHD

+

Summary of Contents for Infi 90 NTPL01

Page 1: ...Process Control and Automation Solutions from Elsag Bailey Group E96 418 Plant Loop Termination Unit NTPL01...

Page 2: ...UIPEMENTS LECTRONIQUES SONT SENSIBLES AUX PERTURBATIONS PAR FR QUENCE RADIO DES PR CAUTIONS DEVRONT TRE PRISES LORS DE L UTILISATION DU MAT RIEL DE COMMUNICATION PORTATIF LA PRUDENCE EXIGE QUE LES PR...

Page 3: ...1 is designed to provide isolation between the INLIM03 and the Plant Loop It has terminals for connecting twinaxial cable and a shield This manual explains how to install and use the NTPL01 It explain...

Page 4: ...rough 4 2 Original 5 1 Original A 1 through A 4 Original Index 1 Original When an update is received insert the latest changed pages and dispose of the super seded pages NOTE On an update page the cha...

Page 5: ...ostatic Sensitive Devices ESD SPECIFIC CAUTIONS We strongly recommend that you turn cabinet power off before doing any termination unit wiring Failure to do so could result in equipment damage Do not...

Page 6: ...IQUE Il est fortement recommande de debrancher l alimentation elec trique du cabinet avant d effectuer toute connexion aux cartes de raccordement du chassis Des dommages aux equipements pour raient su...

Page 7: ...ING AND INSPECTION 2 1 INSTALLING THE TERMINATION UNIT 2 2 Mounting The Termination Unit 2 2 CABLE INSTALLATION 2 3 Termination Unit Cables 2 3 Communication Cable 2 4 POWER WIRING 2 5 SECTION 3 MAINT...

Page 8: ...ter Addresses S1 A 3 A 3 PCU Address Settings S2 A 4 List of Figures No Title Page 1 1 The NTPL01 within a PCU on Plant Loop 1 1 2 1 Mounting and Securing the TPL to the NFTP01 2 2 2 2 TPL Cable Conne...

Page 9: ...NTPL01 isolates the communication signals between Plant Loop and the INLIM03 Figure 1 1 shows an example of the NTPL01 within a PCU on Plant Loop INTENDED USER Technicians should read the manual befo...

Page 10: ...uirements Maintenance Contains a maintenance schedule Repair Replacement Procedures Explains how to replace the termination unit Support Services Explains training documentation and how to order parts...

Page 11: ...on PVC lugs at both ends TPL to LIM Cable PVC TPL to LIM Cable non PVC NKPL01 NKPL02 NKLM01 NKLM02 Loop Interface Module INLIM03 Field Termination Panel NFTP01 Power Requirements Voltage 24 VDC Curren...

Page 12: ...Save the bag for future use 2 Ground Bags Before Opening Before opening a bag con taining an assembly with CMOS devices touch it to the equip ment housing or a ground to equalize charges 3 Avoid Touch...

Page 13: ...The NTPL01 termination unit is ready to install There are no jumpers to set on the TPL Mounting The Termination Unit To mount the termination unit 1 Insert the tabs of the circuit board into the prope...

Page 14: ...must not come into contact with the card edge connector of the ter mination cable while installing the cable After installing both ends of the cable slide the module into the MMU so that the card edg...

Page 15: ...TPL terminals Figure 2 3 TPL Twinaxial Cable Terminal Assignments NOTE If the black band that identifies the lead of the cable is removed you can identify that lead by looking for one tined strand of...

Page 16: ...ready for operation if 1 The circuit board is mounted in the termination mounting unit 2 All required cables are connected to the termination unit 3 Power is connected and is applied to the terminatio...

Page 17: ...ualified personnel should perform maintenance MAINTENANCE SCHEDULE Table 3 1 is the maintenance schedule These tasks are to be performed at the specified intervals Table 3 1 Maintenance Schedule Task...

Page 18: ...tion unit 3 Mark and disconnect the termination unit cable from the P1 socket on the termination unit 4 Remove and save the screws that secure that termination unit to the field termination panel and...

Page 19: ...ermination unit circuit board to the field termi nation panel and replace the chassis ground with the screws saved from step 4 8 Replace the 24 VDC power and DC common wiring Reconnect the termination...

Page 20: ...rs if applicable 3 Bailey instruction manual number page number and refer ence figure that identifies the part When you order standard parts from Bailey Controls use part numbers and descriptions from...

Page 21: ...rmination unit 2 2 Termination unit cable 2 3 Intended user 1 1 L Loop interface module A 1 M Maintenance 3 1 N NFTP01 1 3 Nomenclature 1 3 O Ordering information 5 1 P Plant loop 1 3 R Reference docu...

Page 22: ...8756 ASIA PACIFIC 152 Beach Road Gateway East 20 04 Singapore 189721 Telephone 65 391 0800 Telefax 65 292 9011 EUROPE AFRICA MIDDLE EAST Via Puccini 2 16154 Genoa Italy Telephone 39 10 6582 943 Telefa...

Reviews: