28
28
PLASMA TABLE START-UP PROCEDURE
•
Verify that all cables are connected to the console per the interconnect diagram.
•
MAKE SURE
all equipment is properly grounded. Consult a qualified electrician.
•
Verify that all components have the correct utilities connected both electrical and air.
(Consu
lt individual operator’s manuals)
•
Check that the torch has the correct consumable’s for the amperage you will be running at.
Replace any torch consumable’s that appear damaged or distorted.
•
Be sure and connect the ground clamp from the torch power unit directly to the material
being cut.
•
Turn on the torch power unit. Set air pressure on the torch power unit per specifications in
the plasma cutter
operator’s manual.
Power up the control console:
1. Complete the connection of the console to the
plasma table including connecting the console to a
220V single phase power supply.
2. Twist the emergency stop button clockwise (
cw
) to
reset.
3. Lift the clear cover and press the green push
button switch to power the console
ON
.
Checking motion of the servo motors:
1. From the Logo screen, press the ENTER key to
enter the operating screen.
2. Use the key board Arrow keys to move the torch on
the X and Y axis of the table.
3. Use the toggle switch on the control console to test
the motion of the torch in the “Z” axis.
IMPORTANT:
See Book 2 of 2 for detailed controller operation.
Summary of Contents for PT-105HD
Page 16: ...14 14...
Page 17: ...15 15...
Page 18: ...16 16...
Page 42: ...40 40 ELECTRICAL DIAGRAM...
Page 43: ...41 41...
Page 44: ...42 42...