
21
21
7. Remove and retain the lower two socket head cap
screws (C) used to mount the covers. The top
socket head screw (D) needs to only be loosened
enough to allow the cover to slide behind the screw
head.
8. Match the covers to the correct side of the table
and install the motor covers by sliding the top
slotted hole over the top screw and then installing
the two lower screws.
9. Tighten all three screws.
Torch Mounting
1. If installed, remove the gear rack by taking out the socket
screw, pivoting the rack, and carefully pulling it out from
the torch mounting tube.
2. Loosen the clamping screw (A). Slide the torch through
the center bushing.
3.
Extend the torch through the bushing so that the from 4” to
4
.5” of the torch is below the holder.
4. Hold the torch in this position and tighten the
clamping screw just enough so that the torch does
not slip within the bushing.
C
D
A
Summary of Contents for PT-105HD
Page 16: ...14 14...
Page 17: ...15 15...
Page 18: ...16 16...
Page 42: ...40 40 ELECTRICAL DIAGRAM...
Page 43: ...41 41...
Page 44: ...42 42...