background image

 

 

INTRODUCTION 

 

The quality and reliability of the components assembled on a Baileigh Industrial machine 
guarantee near perfect functioning, free from problems, even under the most demanding 
working conditions. However, if a situation arises, refer to the manual first. If a solution cannot 
be found, contact the distributor where you purchased our product. Make sure you have the 
serial number and  production year of the machine  (stamped on the nameplate). For 
replacement parts refer to the assembly numbers on the parts list drawings. 

 

Our technical staff will do their best to help you get your machine back in working order. 

 

In this manual you will find:  (when applicable) 

  Safety procedures 

  Correct installation guidelines 

  Description of the functional parts of the machine 

  Capacity charts 

  Setup and start-up instructions 

  Machine operation 

  Scheduled maintenance 

  Parts lists 

 

GENERAL NOTES 

 
After receiving your equipment remove the protective container. Do a complete visual 
inspection, and if damage is noted, 

photograph it for insurance claims

 and contact your 

carrier at once, requesting inspection. Also contact Baileigh Industrial and inform them of the 
unexpected occurrence. Temporarily suspend installation. 
 
Take necessary precautions while loading / unloading or moving the machine to avoid any 
injuries. 
 
Your machine is designed and manufactured to work smoothly and efficiently. Following proper 
maintenance instructions will help ensure this. Try and use original spare parts, whenever 
possible, and most importantly; 

DO NOT

 overload the machine or make any modifications. 

 
 

 

Note: This symbol refers to useful information throughout the manual. 

Summary of Contents for PH-28HD

Page 1: ...IAL INC IS PROHIBITED Baileigh Industrial Inc does not assume and hereby disclaims any liability for any damage or loss caused by an omission or error in this Operator s Manual resulting from accident...

Page 2: ...CAL 12 OPERATION 14 Setup and Adjustments 14 Operation 16 MATERIAL SELECTION 17 LUBRICATION AND MAINTENANCE 17 PLATE ASSEMBLY 18 SLEEVE SPACER POST 1 2018 19 UPPER LOWER RAM ASSEMBLY 20 SPROCKET ASSEM...

Page 3: ...e to Seller of any suspected defect in the Goods prior to the expiration of the warranty period The original end user must also obtain a RGA from Seller prior to returning any Goods to Seller for warr...

Page 4: ...or further remedies provided under this Agreement or at law or equity Attorney s Fees In the event legal action is necessary to recover monies due from Buyer or to enforce any provision of this Agree...

Page 5: ...Description of the functional parts of the machine Capacity charts Setup and start up instructions Machine operation Scheduled maintenance Parts lists GENERAL NOTES After receiving your equipment remo...

Page 6: ...zardous situation which if not avoided will result in death or serious injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a h...

Page 7: ...such as ear muffs or earplugs to protect against objectionable or uncomfortable loud noises BEWARE OF PINCH POINTS Keep hands and fingers away from the servo motors drive belt and pulleys when perfor...

Page 8: ...igh does not recommend or endorse making any modifications or alterations to a Baileigh machine Modifications or alterations to a machine may pose a substantial risk of injury to the operator or other...

Page 9: ...tool or machine carefully check any part that appears damaged Check for alignment and binding of moving parts that may affect proper machine operation 15 Observe work area conditions DO NOT use machi...

Page 10: ...nt can be reached at 920 684 4990 and asking for the support desk for purchased machines Tech Support handles questions on machine setup schematics warranty issues and individual parts needs other tha...

Page 11: ...ge painted surfaces Follow manufacturer s label instructions when using any type of cleaning product After cleaning wipe unpainted metal surfaces with a light coating of quality oil or grease for prot...

Page 12: ...to the floor Level the machine so that all the supporting feet are taking the weight of the machine and no rocking is taking place Follow these guidelines when lifting crane or hoist Always lift and c...

Page 13: ...e in position prior to placing the machine The accuracy of any machine depends on the precise placement of it to the mounting surface FLOOR This machine distributes a large amount of weight over a sma...

Page 14: ...indicated on the machine All line connections should make good contact Running on low voltage will damage the motor In the event of a malfunction or breakdown grounding provides a path of least resist...

Page 15: ...ENGTH AMP RATING 25ft 50ft 100ft 1 12 16 16 14 13 16 14 12 12 17 20 12 12 10 21 30 10 10 No WIRE GAUGE An undersized cord decreases line voltage causing loss of power and overheating All cords should...

Page 16: ...ghly artistic operation It requires time and experience to become proficient at creating the desired results The best recommendation is to practice take notes experiment and seek out advice through te...

Page 17: ...change release lever MUST be locked in the UP position before and during operation Operating the power hammer with the release lever in the lower position will damage the machines operating linkage 6...

Page 18: ...and is more forgiving To shrink start feeding the metal in slowly controlling the shrink by your foot control slowing as you pull out not to flatten the edge too much 5 The hammer mode is also used fo...

Page 19: ...und it Lubricate threaded components and sliding devices Apply rust inhibitive lubricant to all non painted surfaces Grease the fittings every month with two pumps from a standard grease gun Check for...

Page 20: ...18 18 PLATE ASSEMBLY...

Page 21: ...19 19 SLEEVE SPACER POST 1 2018...

Page 22: ...20 20 UPPER LOWER RAM ASSEMBLY...

Page 23: ...21 21 SPROCKET ASSEMBLY...

Page 24: ...22 22 SPRING ASSEMBLY...

Page 25: ...23 23 LEVER ASSEMBLY...

Page 26: ...24 24 SLIDE STROKE ASSEMBLY...

Page 27: ...25 25 QUICK RELEASE ASSEMBLY...

Page 28: ...26 26 TIMING BELT ASSEMBLY PRE JAN 2018...

Page 29: ...27 27 ELECTRICAL BOX ASSEMBLY PRE JAN 2018...

Page 30: ...28 28 GUARD ASSEMBLY PRE JAN 2018...

Page 31: ...29 29 V BELT ASSEMBLY POST JAN 2018...

Page 32: ...30 30 GUARD AND CONTROL BOX ASSEMBLY POST JAN 2018...

Page 33: ...0 X 1 5 X 40 Hex Flange 8 13 M8 X 1 25 X 40 Hex Flange 4 14 3 4 10 HEX NUT Std 6 15 5 16 18 HEX NUT Std 4 16 PH24 6A001 Side Frame 1 17 PH24 6A022 Lower Tool Block 1 18 PH24 6A031 Top Slide Block 1 19...

Page 34: ...Plate Spacer 4 49 MH19 7A005 V2 Crank Shaft 25 Offset 1 50 MH19 6A071 Crankshaft Key 1 51 PP 1778 56T Timing Pulley 1 52 PP 0828 Tapered Lock Bushing 2 53 PP 1692 Rubber Standoff 4 54 PP 1782 80T Timi...

Page 35: ...1004 1 25 ID X 1 75 OD X 125 Thrust Washer 2 86 PH24 7A039 Toggle Block Shaft 1 87 PH24 6A028 Slide Block 2 88 PH24 6A050 Main Lever V2 1 89 PH24 7A014 Main Pivot Hub 1 90 PH24 7A015 Main Pivot Pin 1...

Page 36: ...7A010 Spring Shaft 1 118 PH24 7A011 Threaded Spring Shaft 1 119 PP 0835 1 50 ID X 1 75 OD X 1 0 Bushing 6 120 PP 0143 1 25 OD X 1 0 ID X 1 25 LG 2 121 PH24 7A029 Rocker Pin 1 122 M12 X 1 75 Jam Nut 2...

Page 37: ...25 X 10 Button Head 4 152 M6 X 1 0 X 12 Button Head 7 153 M6 X 1 0 X 10 Button Head 18 154 PP 0587 1 4 X 2 Pipe 1 155 STD Straight Grease Zerk 13 156 PH24 6A056 Slide Stroke Guard 1 157 M5 X 0 8 X 10...

Page 38: ...25 Lock Washer 3 178 PH24 5A010 Controller Stand 1 179 PP 1846 Leveling Foot 4 180 PP 1831 Control Box 1 181 5 16 18 Acorn Nut 4 182 PH24 6A049 V2 Spring Guard Version V2 1 183 PH24 7A050 Spring Guard...

Page 39: ...37 37 NOTES...

Page 40: ...4 www baileigh com BAILEIGH INDUSTRIAL INC 1455 S CAMPUS AVENUE ONTARIO CA 91761 PHONE 920 684 4990 FAX 920 684 3944 BAILEIGH INDUSTRIAL LTD UNIT D SWIFT POINT SWIFT VALLEY INDUSTRIAL ESTATE RUGBY WES...

Reviews: