
15
15
3. Pull outward and down on the release lever to raise
the hammer to allow additional clearance for tool
changes. Verify that the lever is locked into the
lower position (Up position shown).
4. Install the desired tooling (sold separately) into the
lower and upper rams and lock in position using the
retaining pins.
5. Pull outward and up on the release lever to lower
the hammer to the operating position. Verify that
the lever is locked into the upper position (Shown).
IMPORTANT:
The tool change release lever
MUST be locked in the UP position before and during
operation. Operating the power hammer with the
release lever in the lower position will damage the
machines operating linkage.
6. Adjust the anvil height by loosening the two guide
screws just enough to allow the anvil to move up or
down.
7. Turn the handwheel on the right side of the frame
so that the hammer tool is at the lowest (closest)
point of its travel.
8. Turn the adjustment collar to raise or lower the
anvil post. The initial setting for the gap between
the lower and upper tool should be the same as the
material thickness.
Note: Shown with no tool installed.
Normal adjustment would have a tool set installed.
Summary of Contents for PH-28HD
Page 20: ...18 18 PLATE ASSEMBLY...
Page 21: ...19 19 SLEEVE SPACER POST 1 2018...
Page 22: ...20 20 UPPER LOWER RAM ASSEMBLY...
Page 23: ...21 21 SPROCKET ASSEMBLY...
Page 24: ...22 22 SPRING ASSEMBLY...
Page 25: ...23 23 LEVER ASSEMBLY...
Page 26: ...24 24 SLIDE STROKE ASSEMBLY...
Page 27: ...25 25 QUICK RELEASE ASSEMBLY...
Page 28: ...26 26 TIMING BELT ASSEMBLY PRE JAN 2018...
Page 29: ...27 27 ELECTRICAL BOX ASSEMBLY PRE JAN 2018...
Page 30: ...28 28 GUARD ASSEMBLY PRE JAN 2018...
Page 31: ...29 29 V BELT ASSEMBLY POST JAN 2018...
Page 32: ...30 30 GUARD AND CONTROL BOX ASSEMBLY POST JAN 2018...
Page 39: ...37 37 NOTES...