![Baicells BRU35 Series Installation Manual Download Page 17](http://html1.mh-extra.com/html/baicells/bru35-series/bru35-series_installation-manual_3461055017.webp)
Nova-243 Outdoor LTE TDD Base Station Installation Guide
11
2.
Make sure the base station’s installation height, fit the thread rod of the assembled
bracket to the pole, and then pass the two omegas through the threaded rods, and
fasten the four flat gaskets, four spring gaskets, and four nuts.
3. Mount the base station vertically on the bracket and tighten M6 screw on the top of
bracket using cross screwdriver to complete the installation.