Baicells BRU35 Series Installation Manual Download Page 13

Nova-243 Outdoor LTE TDD Base Station Installation Guide 

 

 

Installation Environment 

2.3

2.3.1  Locational Requirements 

Environments  with  high-temperatures,  harmful  gases,  unstable  voltages,  volatile 

vibrations, loud noises, flames, explosives, and electromagnetic interference (large radar 

stations, transmitting stations, transformer substations) are not suitable for the operation 

of Nova-243, and thus should be avoided.   

Places prone to have impounded water, soaking, leakage, or condensation, should also 

be avoided.   

Factors  like  climate,  hydrology,  geology,  earthquake,  electric  power,  and  transportation 

should be taken into consideration  in  the construction process  so that a proper location 

can be chosen  to meet the communication engineering environmental requirements, as 

well as the technical requirements of network planning and communication equipment. 

2.3.2  Environmental Requirements 

Table 2-2 

gives the base station’s environmental requirements on temperature, humidity, 

and voltage.   

Table 2-2 Environmental Requirements of the Base Station 

Item 

Range 

Typical value 

Temperature 

-40°C to 55°C 

25°C 

Relative humidity (no condensation)  0% to 100% 

5% to 95% 

Safety voltage 

42 V to 58 V 

48 V 

 

2.3.3  Power Requirements 

Nova-243 TDD base station adopts -48V DC power supply. For the safety and reliability of 

device, we have the following suggestions. 

 

Remote DC power supply, in general, AC power supply is 100V ~ 270V, the distance 

of AC power supply to the device is less than 30 meters. 

 

If the static exceeds a certain range, it will lead to great damage to the circuit and the 

whole device. 

 

Personnel Requirements 

2.4

The installation personnel must master the basic safe operation knowledge, through the 

Summary of Contents for BRU35 Series

Page 1: ...03 All rights reserved Baicells Technologies Co Ltd Nova 243 Outdoor LTE TDD Base Station Installation Guide...

Page 2: ...ase station Copyright Notice Baicells copyrights this specification No part of this specification may be reproduced in any form or means without the prior written consent of Baicells Disclaimer This s...

Page 3: ...Released 16 Jan 2018 02 Optimize descriptions and fix some bugs 4 Apr 2018 03 Fix bugs Contact Us Baicells Technologies Co Ltd Address 3F Bldg A No 1 Kai Tuo Rd Haidian Dist Beijing PR China 100085 E...

Page 4: ...g Materials 6 2 1 Installation Tools 6 2 2 Installation Environment 7 2 3 2 3 1 Locational Requirements 7 2 3 2 Environmental Requirements 7 2 3 3 Power Requirements 7 Personnel Requirements 7 2 4 Aga...

Page 5: ...rnet Cable 14 3 6 5 Connect Power Connector 14 3 6 6 Connect Ground Cable 16 Install Antenna Feeder System 17 3 7 3 7 1 Install Omnidirectional Antennas 17 3 7 2 Install Directional Antennas 18 4 Powe...

Page 6: ...e 3 5 Omnidirectional Antenna Installation 1 17 Figure 3 6 Omnidirectional Antenna Installation 2 18 Figure 3 7 Assembling Procedure of Directional Antennas 18 Figure 3 8 Transportation the Antennas i...

Page 7: ...erators enterprises government police security and so on Features 1 2 Adopt the integration design of baseband and RF Based on 3GPP international standard LTE TDD technology provide high speed data se...

Page 8: ...Installation Guide 2 Appearance 1 3 The Nova 243 base station appearance is shown in Figure 1 1 Figure 1 1 Nova 243 Appearance The Nova 243 interfaces and indicators are shown in Figure 1 2 Figure 1...

Page 9: ...a 243 interface indicators are described in Table 1 2 Table 1 2 Nova 243 Interface Indicators Identity Color Status Description RUN Green Fast flash 0 125s on 0 125s off The board is loading Slow flas...

Page 10: ...Pole wall Antenna External high gain antenna Overall Power 160 W Power 48V DC AC adaptor multi national standards Weight About 12 kg Note The test method of receiving sensitivity is proposed by the 3...

Page 11: ...online status management Support performance statistics Support failure management Support configuration management Support local or remote software upgrading and loading Support log Support connecti...

Page 12: ...an 100m Power plug The power plug connecting to the electricity supply Antenna RF cable 50 ohm feeder Ethernet cable Outdoor CAT6 Shorter than 100m Antenna Omnidirectional or directional antenna Groun...

Page 13: ...mental requirements as well as the technical requirements of network planning and communication equipment 2 3 2 Environmental Requirements Table 2 2 gives the base station s environmental requirements...

Page 14: ...than 16 mm Grounding principle as near as possible The base station connects to the reliable outdoor grounding point earth through one ground screw The connection of the grounding points and the groun...

Page 15: ...lation procedure of Nova 243 is given in Figure 3 1 Figure 3 1 Installation Procedure of Nova 243 Install GPS Antenna 3 3 Installation requirements on the GPS antenna No major blocking from buildings...

Page 16: ...acket on the base station using the M4 x 14 screws as shown in Figure 3 2 Figure 3 2 Install the GPS Antenna Install on Pole 3 4 Required diameter of the pole 30mm 100mm and suggest the installation h...

Page 17: ...thread rod of the assembled bracket to the pole and then pass the two omegas through the threaded rods and fasten the four flat gaskets four spring gaskets and four nuts 3 Mount the base station vert...

Page 18: ...nstall on Wall 3 5 The wall must bear four times of the base station s weight 1 Take apart the assembled bracket 2 Install three mounting hooks on the base station with M6 x 16 screws 3 Fit the base s...

Page 19: ...4 5 380mm Bending radius requirement of jumper cable 1 4 35mm 1 2 super soft 50mm 1 2 ordinary 127mm Bending radius requirement of power cable and grounding cable tripled of the diameter of cable Bind...

Page 20: ...atherproof protection 3 6 4 Connect Ethernet Cable 1 Connect the Ethernet cable to ETH0 interface in the wiring cavity 2 Lay Ethernet cable along the wire groove and stretch out the wiring cavity from...

Page 21: ...ve wire and neutral wire 3 Connect the power cable to PWR interface in the wiring cavity 4 The power cable lays along the lint slot and stretch out the wiring cavity from PWR hole 5 The input of the p...

Page 22: ...l situation of the installation site The Nova 243 provides two grounding screws which is located on the bottom of the base station as shown in Figure 3 4 Figure 3 4 Location of Grounding Screws 1 Unsc...

Page 23: ...irectional outdoor antenna on the pole Make sure that the antenna is high enough to meet the coverage requirement and that the antenna top falls within the 45 degrees safety angle towards the lighteni...

Page 24: ...irectional Antennas 1 First assemble the antennas as shown in Figure 3 7 Figure 3 7 Assembling Procedure of Directional Antennas 2 To install it on the iron tower use a pulley to transport the antenna...

Page 25: ...asten it with steel wires Then mount the directional outdoor antenna onto the pole using the installation rack as shown in Figure 3 9 Figure 3 9 Directional Antenna Installation 4 When the base statio...

Page 26: ...Indicator Description Identity Color Status Description RUN Green Fast flash 0 125s on 0 125s off The board is loading Slow flash 1s on 1s off The board is normal OFF No power input or board fault AL...

Page 27: ...tenna Dual Pole Baicells Technologies Co Ltd ANT 2G13 R 65 EDT0 13 External Omnidirectional Antenna Single Pole Baicells Technologies Co Ltd ANT 2G12 R 65 EDT0 10 External Omnidirectional Antenna Sing...

Page 28: ...measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the recei...

Page 29: ...nement The antenna s used for this transmitter must be installed to provide a separation distance of at least 4 5m from all persons and must not be collocated or operating in conjunction with any othe...

Reviews: