Baicells Nova R9 2.5GHz 10W Base Station Installation Guide
9
3.2.1 Wall Installations
3. Fix three mounting hooks on both ends of the base station with M6*16 screw, as
shown in Figure 3-2.
4. Put the base station with mounting hook on the wall, mark the drilling locations, as
shown in Figure 3-3.
5. Drill three 12mm holes on the wall where marked.
6. Fix the base station to the wall using M10*80 expansion screws.
3.2.2 Install on Pole
1. Fix the mounting bracket with M6*16 screws on the base station, as shown in Figure
3-4.
Figure
3
-
3
Drilling Locations on Wall