Baicells Nova R9 2.5GHz 10W Base Station Installation Guide
5
2. Installation Preparation
Prepare following supporting materials, given in Table 2-1.
Table 2-1 Supporting Materials for Base Station Installation
Name
Description
Power line
< AWG16
,
e.g., AWG14
Shorter than 1150 feet
Antenna feeder
50 ohm feeder
Ethernet Cable
Outdoor CAT6
Antenna
Omnidirectional, or directional antenna
Ground wire
16mm² yellow/green wire
GPS
GPS antenna, N type cable, and GPS mounting bracket
Installation Tools
The following tools are needed during the installation.
Level bar
Marking pen
Knife
Vise
Wrench
Percussion drill and
some drill heads
hammer
Cross
screwdriver
Cable vise
Tape measure
5mm L-shape allen
wrench
Water-proof
tape
Insulating tape
Ladder
Supporting Materials