Baicells Nova R9 2.5GHz 10W Base Station Installation Guide
7
Note that the wire must be inserted in the GND port and fastened with an M6 screw, then
welded with an anticorrosive process. The wire should be no smaller than 16 mm
2
, as short
as possible, and without coiling. Figure 2-1 shows the grounding.
Figure 2-1 Grounding and Lightning Protection
3. Installing the Base Station
The installation of the base station needs to be completed by professionals to meet the
installation requirements. The installation procedure is shown below in Figure 3-1.
Installation Procedure