Nova-436 Outdoor LTE TDD Base Station Installation Guide
17
2. Connect the optical fiber to
OPT
interface in the wiring cavity.
3. Lay optical fibers along the wire groove, and stretch out the wiring cavity from
OPT
hole.
The redundant fiber should wind neatly.
3.6.5 Connect Ethernet Cable
1. Connect the Ethernet cable to
ETH
interface in the wiring cavity.
2. Lay Ethernet cable along the wire groove, and stretch out the wiring cavity from
ETH
hole.
3.6.6 Connect Power Connector
Because it is not sure that the distance between the installation site and the power
supply device, the two ends of power adapter are bare terminal end. The operators need
to make power cable according to the actual conditions on installation site, and assemble
power plug and power terminal on two ends of power adapter.
Strip 12mm insulating layer with wire stripper, which is used for connection to connector.
It is recommended that the power cord length is kept below 100m (330 feet).
The connection steps of power cable is as follows.
1. Assemble power plug.
The power plug will be installed on the end of input direction. Refer to the
identification on power plug, connect live wire, neutral wire, and ground wire to
corresponding terminals separately, and tighten screws.
2. Assemble power terminal.
The power terminal will be installed on the end of output direction. Refer to the
following figure to connect live wire and neutral wire.
3. Connect the power cable to
PWR
interface in the wiring cavity.
4. The power cable lays along the lint slot, and stretch out the wiring cavity from
PWR
hole.
5. The input of the power adaptor connects to the outlet.