Installation
Page 7
June 2020
TRB-UM-00287-EN-07
INSTALLATION
Prior to installation, the flow meter should be checked internally for foreign
material and to ensure the turbine rotor spins freely� Fluid lines should also be
checked and cleared of all debris�
The flow meter must be installed with the flow arrow, etched on the exterior
of the meter body, pointing in the direction of fluid flow� Though the meter is
designed to function in any position, it is recommended, where possible, to install
horizontally with the conduit adapter facing upward� Thread a magnetic pickup
(Blancett model B111109 or equivalent) into the conduit adapter completely
finger tight without forcing� Secure with a lock nut if supplied� Install conduit or
other fittings suitable for the installation area onto the conduit adapter hub on the
flow meter�
The liquid being measured should be free of any large particles that may obstruct
rotation of the rotor� If particles are present, a mesh strainer should be installed
upstream before operation of the flow meter�
The preferred plumbing setup is one containing a bypass line (
that allows meter inspection and repair without interrupting flow� If a bypass line
is not used, it is important that all control valves be located downstream of the
flow meter (
)�
PRESSURE IN EXCESS OF ALLOWABLE RATING MAY CAUSE THE HOUSING TO
BURST AND CAUSE SERIOUS PERSONAL INJURY.
DAMAGE CAN BE CAUSED BY STRIKING AN EMPTY METER WITH A HIGH
VELOCITY FLOW STREAM.
5 Pipe Diameters
Minimum
10 Pipe Diameters
Minimum
Isolation
Valve
Isolation
Valve
QuikSert Turbine
Flow Meter
Bypass Line
Figure 3: Meter installation using a bypass line