background image

49

x2

3/8 x 5-3/16 x 72" (1 x 13,2 x 182,9 cm)

PARTS REQUIRED:

SOFFIT

x32

Place

 72"

 soffit board primed side down on bottom side of rafter and nailer 

(Fig. A) 

and flush to front overhang 

(Fig. B) 

and side wall.

Place 

69-3/8"

 soffit board primed side down on bottom side of rafter and nailer 

(Fig. A) 

and flush to back overhang 

(Fig. C)

 and side wall.

Secure using 

1-1/4" 

screws 12" apart and angle into rafter 

(Fig. C)

Secure using 

1-1/4" 

screws 12" apart and angle into rafter 

(Fig. C)

2

BEGIN

1

Repeat  STEPS 1 - 2 on the opposite side.

You have finished installing your front soffit panels.

FINISH

72"

(182,9 cm)

1-1/4" (3,2 cm)

69-3/8"

(176,2 cm)

x2

3/8 x 5-3/16 x 69-3/8" (1 x 13,2 x 176,2 cm)

Flush

1-1/4" (3,2 cm) 

Screws

SIDE VIEW

Primed Side Down

12" 

(30,5 cm)

Soffit 

Nailer

CENTER

Rafter

1-1/4" (3,2 cm) 

Screws

Flush

1-1/4"

(3,2 cm) 

Screws

Fig. B

Fig. A

Fig. D

Fig. C

Summary of Contents for Heartland Rockport 8x12

Page 1: ...bly or product information call our toll free number 1 800 577 9663 or email customerservice heartlandind com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST...

Page 2: ...This page intentionally left blank...

Page 3: ...ore building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a l...

Page 4: ...lation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface vis...

Page 5: ...en designed for general use Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional mate...

Page 6: ...sorting parts by the category they are listed in RAFTERS x11 7 1 4 x 18 1 4 18 4 x 46 4 cm TRIM x8 3 8 x 1 3 4 x 67 3 4 1 x 4 4 x 172 1 cm x2 19 32 x 3 x 36 3 4 1 5 x 7 6 x 93 3 cm x2 3 8 x 2 3 4 x 8...

Page 7: ...x 14 8 x 20 cm x2 2 x 3 x 5 1 8 5 1 x 7 6 x 13 cm WD x4 2 x 3 x 7 7 8 5 1 x 7 6 x 20 cm DY OO x2 1 1 4 x 2 1 2 x 69 3 2 x 6 3 x 175 3 cm x2 19 32 x 6 15 16 x 5 1 2 1 5 x 17 6 x 13 4 cm 5 PANEL PARTS L...

Page 8: ...DWARE BAG x2 3 8 x 19 5 8 x 72 1 x 49 8 x 182 9 cm 6 1 1 4 3 2 cm 2 5 1 cm 2 1 2 6 4 cm 3 7 6 cm 3 4 1 9 cm 2 5 0 cm 3 7 6 cm 2 5 1 cm 1 1 2 3 8 cm x2 x8 x1 WINDOW x2 1 2 1 3 cm 8 x 16 20 3 x 35 6 cm...

Page 9: ...For best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQU...

Page 10: ...ates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure...

Page 11: ...3 cm 296 2 cm 357 2 cm 236 2 cm 48 92 5 8 Center on marks Stagger Seams Flush Flush Flush Flush DOOR 1 Orient parts as shown on flat surface Measure and mark Secure using 2 3 nails at each mark and 4...

Page 12: ...squareness by measuring diagonally across the corners If the measurements are the same the frame is square The diagonal measurement will be approximately 170 1 4 432 4 cm When the frame is level and...

Page 13: ...e is square by installing 1 panel and squaring frame Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The me...

Page 14: ...ent on the floor joists 5 x1 x1 x110 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm 5 8 x 44 5 8 x 96 1 6 x 113 3 x 243 8 cm 2 5 1 cm FLOOR PANELS Secure panels using 2 nails 6 apart on edges and 12 apart insid...

Page 15: ...alling floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over ha...

Page 16: ...cm UM x7 TM YF TM YF HINT For easier nailing stand on frame x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x2 2 x 4 x 68 5 8 5 1 x 10 2 x 174 3 cm YF x7 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM x32 14 DOOR 3 7 6 c...

Page 17: ...cm Place 48 x 72 panel onto wall frame flush to top of frame Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel using 2 2 nails in the corners Fig A Ensure your wall frame...

Page 18: ...ing up Nail using 2 nails 6 apart on edges and 12 apart inside panel 6 Place end 44 5 8 x 72 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside...

Page 19: ...2 3 8 cm 1 1 2 3 8 cm 1 1 2 3 8 cm UM x7 TM YF TM YF HINT For easier nailing stand on frame x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x2 2 x 4 x 68 5 8 5 1 x 10 2 x 174 3 cm YF x7 2 x 4 x 68 5 1 x 10 2 x...

Page 20: ...wall frame is square by installing 1 panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the...

Page 21: ...p Nail using 2 nails 6 apart on edges and 12 apart inside panel 5 Place end 44 5 8 x 72 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel...

Page 22: ...1 cm SZ x3 2 x 4 x 68 5 x 10 2 x 172 7 cm UM x12 3 7 6 cm 20 20 1 2 44 1 2 68 1 2 89 68 52 1 cm 1 1 2 3 8 cm 113 cm 174 cm 226 1 cm 172 7 cm BACK WALL FRAME Orient parts on edge on floor Measure and m...

Page 23: ...THE PRIMED SIDE FACING UP 3 4 GAUGE BLOCK 6 15 2 cm 1 2 5 cm 3 4 1 9 cm Flush For squareness maintain 3 4 measurement along panel edges BEGIN HERE 12 30 2 cm Place 48 x 72 panel onto wall frame as sho...

Page 24: ...121 9 x 182 9 cm x32 2 5 1 cm 22 BACK WALL PANELS 6 15 2 cm 1 2 5 cm 3 4 1 9 cm Flush 12 30 2 cm Place 2nd 48 x 72 panel onto wall frame flush to installed panel Secure panel using 2 nails 6 apart on...

Page 25: ...ide of back of wall panel Fig A Secure PT to top plate using 8 3 screws 4 3 7 6 cm Screws INSIDE OF SHED PT PT x1 2 x 3 x 96 5 1 x 7 6 x 243 8 cm PARTS REQUIRED Your back wall is now assembled FINISH...

Page 26: ...r easier nailing stand on frame 15 3 4 40 cm 15 3 4 40 cm 16 1 2 41 9 cm 16 1 2 41 9 cm x1 2 x 4 x 89 5 x 10 2 x 226 1 cm SZ 3 7 6 cm PARTS REQUIRED x8 FRONT WALL BEGIN 1 UM RD SZ UM RD 3 7 6 cm Nails...

Page 27: ...2 cm 6 15 2 cm PARTS REQUIRED FRONT WALL x2 x38 2 5 1 cm OO 3 7 6 cm For squareness maintain flush along panel edges Flush Flush Flush Flush SZ Place 19 5 8 x 72 panel onto wall frame flush to SZ wit...

Page 28: ...B Secure using 5 3 screws on angle and spaced evenly 4 You have finished building your front wall FINISH Fig B Flush to 2x4 Flush Front wall panel Front wall panel UM FW SZ FW FW NOTE Drive screws at...

Page 29: ...x2 x27 RIGHT SIDE WALL INSTALLATION x1 2 x 4 x 69 7 8 5 1 x 10 2 x 177 5 cm WW TEMPORARY 3 7 6 cm Screws 1 panel overhang WW 3 Nails into bottom plate DOOR DOOR ENSURE 20 5 8 MEASUREMENT IS TOWARD BA...

Page 30: ...using 3 nails Fig A x12 x2 x27 LEFT SIDE WALL INSTALLATION 3 7 6 cm Screws WW 3 Nails into bottom plate DOOR DOOR Install 1 wall panel overhang toward the bottom BEGIN Center left sidewall assembly o...

Page 31: ...RE SECURING Fig A 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Screw Flush Flush x4 1 2 Set back wall on side wall top plates between left and right walls BEGIN Secure wall using 3 screws int...

Page 32: ...oor frame Fig B 6 15 2 cm 3 7 6 cm Nails 3 7 6 cm Nails into bottom plate 2 5 1 cm Nails BACK WALL INSTALLATION x18 1 1 2 3 8 cm PARTS REQUIRED 4 Secure top plates to side walls using 2 3 nails into l...

Page 33: ...e walls Secure top plate to side walls using 2 3 nails Fig A B E Secure lower edge of panel to floor frame using 8 2 nails 6 apart Angle nail to hit floor frame Fig C Secure bottom plates using 3 3 na...

Page 34: ...ACHED Repeat STEPS 2 4 to build 3 additional rafter assemblies Remove DY SET ASIDE ONE GUSSET WITH FINISHED WOOD GRAIN PATTERN Secure gusset to rafters using 12 2 nails as shown 4 5 3 2 107 1 8 272 1...

Page 35: ...EGIN 1 Align over studs Fig B Fig A Flush to inside of panel Install the 1 GUSSET rafter aligned with front stud flush to inside of front wall panelsc and tight to side wall Fig A B Face gusset inward...

Page 36: ...UY may partially extend into window opening 1 3 4 4 5 cm 1 3 4 4 5 cm 1 5 8 3 8 cm 6 1 2 16 5 cm 17 1 2 44 5 cm YG 6 15 2 cm 6 15 2 cm Flush 2 1 BEGIN Your front wall gable is now assembled FINISH Pl...

Page 37: ...up Place left back gable panel on YFB as shown Secure using 1 1 2 nails 6 apart 2 1 BEGIN Place right back gable panel on YFB flush to left panel Secure using 1 1 2 nails 6 apart 1 3 4 4 5 cm 3 1 2 8...

Page 38: ...stalled FRONT WALL GABLE PARTS REQUIRED Caulk on top of front wall panels first as shown Place front gable assembly centered on front wall and flush to rafter peak Fig A Secure front gable panels into...

Page 39: ...le Z Strip 2 5 1 cm Finish Nails 16 40 6 cm 2 5 1 cm Finish Nails CENTER Z Strip ON WALL PANELS OUTSIDE OF SHED Fig A PT Center Z Strip on back wall panels Fig A Secure Z Strip to PT using 8 2 finish...

Page 40: ...back wall gable assembly on z strip Gable panels should be flush to wall panel as shown Fig A Secure gable assembly to PT using 2 nails 6 apart Your back gable is now installed 1 BEGIN FINISH Preasse...

Page 41: ...trim using 10 1 1 4 screws from inside approximately 7 apart Position second WW flush to panel edge and flush to WW already attached Fig A Secure trim using 10 1 1 4 screws from inside approximately 7...

Page 42: ...ew 1 BEGIN Repeat STEP 1 to make three additional overhang frame assemblies BUILD FOUR OVERHANG FRAMES You have assembled 4 overhang frames FINISH x4 DY Flat WE x4 2 x 3 x 68 7 16 5 1 x 7 6 x 173 8 cm...

Page 43: ...Clamp in position before screwing Fig C Flush Flush BEGIN 1 Position 2 x 5 spacer flush to front of rafter and wall panel Secure using 2 2 nails Fig A Position overhang framing flush to rafter Fig B C...

Page 44: ...erhang boards flush to front wall Fig A Secure using 12 1 1 4 screws Ensure overhang boards are flush at peak Fig A 4 x2 3 8 x 7 7 8 x 57 7 8 1 x 20 x 147 cm Primed Side Down x12 1 1 4 3 2 cm INSTALL...

Page 45: ...1 1 4 3 2 cm Screws Flush Flush Flush Install 2 7 7 8 x 7 7 8 overhang boards flush to front wall and soffit block Fig A Fig B Secure using 2 1 1 4 screws 5 x4 x2 3 8 x 7 7 8 x 7 7 8 1 x 20 x 20 cm P...

Page 46: ...h Install 2 5 13 16 x 7 7 8 overhang boards flush to front wall and to previously installed overhang boards Fig A Fig B Secure using 2 1 1 4 screws 6 x4 x2 3 8 x 5 13 16 x 7 7 8 1 x 14 8 x 20 cm 1 1 4...

Page 47: ...first using 3 1 1 4 screws Continue securing overhang frame working upward toward peak Repeat STEP 10 on opposite side Secure overhang framing together using 1 3 screw Fig A x16 1 1 4 3 2 cm Flush Fi...

Page 48: ...osition WML with primed side out flush to peak and to overhang framing Fig A Secure using 2 finish nails 12 apart as shown Repeat STEP 9 on opposite side with WMR Your front wall overhang is now insta...

Page 49: ...ur soffit nailer Align WS flush to markings Fig A and use WD as a gauge block as shown Fig B Secure nailer at each stud using 2 nails angled into stud Fig C Use 2 nails at seam Install ZM flush to WS...

Page 50: ...using 3 2 1 2 screws as shown Fig A Repeat STEP 1 for opposite side Fig B Your back wall soffit blocks are now installed PARTS REQUIRED x6 Fig A Fig B Flush WD WD Flush 3 2 1 2 6 4 cm Screws 3 2 1 2...

Page 51: ...ang Fig C and side wall Secure using 1 1 4 screws 12 apart and angle into rafter Fig C Secure using 1 1 4 screws 12 apart and angle into rafter Fig C 2 BEGIN 1 Repeat STEPS 1 2 on the opposite side Yo...

Page 52: ...using 6 15 16 measurement down and flush to bottom of soffit board as shown Secure cap using 3 2 finish nails as shown Fig A Repeat STEP 1 to install right corner soffit cap Fig B You have finished at...

Page 53: ...ing Roof panels may cause serious injury until securely fastened 1 BEGIN 2 5 1 cm PARTS REQUIRED ROOF PANELS Two Nails 4 8 1 2 1 9 c m Flush Fig D Flush at peak Fig B Flush at peak 7 16 x 47 7 8 x 48...

Page 54: ...s 6 apart on edges and 12 apart inside panel Attach 22 x 96 roof panel flush to the installed panel Fig I and front rafter Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel...

Page 55: ...RTS REQUIRED COLLAR TIES FINISH 1 BEGIN Position and level 2 TKA collar ties on 2nd and 4th rafter from back wall HINT For best appearance install collar tie on rafter facing away from door opening Yo...

Page 56: ...1 cm Finish Nails Flush Position left and right corner soffit cap Primed Side Out flush to bottom of overhang as shown Secure using 3 2 finish nails Fig A Fig B Position center gable decorative trim...

Page 57: ...to roof panels Fig A Secure using 2 2 finish nails at each rafter and 4 2 finish nails at seam Repeat STEP 1 to install fascia fascia boards on the opposite side Your eave fascia boards are now instal...

Page 58: ...ttach temporary supports OO and GAA as shown OO GAA OFFSET 4 3 7 6 cm Screws 1 1 4 3 cm Screws 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm x4 Bottom edges Flush 1 x 3 x 5 2 5 x 7 6 x...

Page 59: ...n 2 3 3 7 6 cm Screws into door trim 3 7 6 cm Screw 3 7 6 cm x13 OO Flush against wall panels Fig A OO Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using...

Page 60: ...installed DOOR PARTS REQUIRED FINISH 3 4 1 9 cm x44 2 5 1 cm x8 Center 7 17 8 cm 7 17 8 cm 2 Nails x8 Fig B Nail into framing Door Trim Hinge Board Fig A Door Panel WR GI GI 2 Center trim WR over door...

Page 61: ...m HINT Caulk behind frame near edge before installing x2 BEGIN 1 From outside of shed position window in opening and level Use 2 screws at top of windows Do not fully tighten screws 2 Apply high quali...

Page 62: ...Remove 1 1 4 screws Position WA centered on inside window frame as shown Secure using 2 2 finish nails Flush Flush Flush EY x 2 WA WA Centered 31 78 7 cm Centered Centered x2 19 32 x 2 1 2 x 36 3 4 1...

Page 63: ...s WINDOWS x12 3 4 1 9 cm 6 Your window is now installed FINISH Install 3 4 screws as shown From inside snip or bend over protruding finish nails Do not screw into window flange INSIDE OF SHED Snip off...

Page 64: ...IP OO FINISH Fig A Center OO in door opening 11 27 9 cm Approximately BEGIN Center OO s vertically on the left and right doors as shown Fig A Fig B Secure using 7 2 screws through outside trim into OO...

Page 65: ...when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR 63 PARTS REQUIRED DOOR x2 5 16 0 8 cm Drill Bit Your spring bolts are now install...

Page 66: ...ough DOOR HARDWARE DECORATIVE HINGES x1 3 4 1 9 cm x16 x4 x2 PARTS REQUIRED 1 1 2 3 8 cm BEGIN 1 1 2 1 3 cm Drill Bit 1 4 0 6 cm Drill Bit Flush to hinge Fig A Attach inside handle and secure with set...

Page 67: ...ISH Your corner trim is now installed 67 3 4 172 1 cm 67 3 4 172 1 cm x4 3 8 x 1 3 4 x 67 3 4 1 x 4 4 x 172 1 cm BEGIN 1 Attach corner trim as shown using 2 finish nails Flush under gable panel Seam i...

Page 68: ...om bottom and 1 in from inside face into solid 2x3 framing BEGIN 1 FINISH Swing door open to locate eye Repeat installation for 2nd hook and eye Fig A Install hook into endcap and into 2x3 behind as s...

Page 69: ...nd one vent in the back wall gable Caulk behind vent flanges Your vents have now been installed Secure using 1 2 screws x12 1 2 1 3 cm x2 VENTS 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6...

Page 70: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 71: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 72: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 73: ...t ridge cut to peak with a utility knife Repeat STEPS 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 74: ...ut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 75: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut 1 piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge c...

Page 76: ...siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This...

Reviews: