FRONT FASCIA TRIM
44
PARTS REQUIRED:
2" (5,1 cm)
x14
FINISH
You have finished installing your front fascia
Position
ZX
primed side out, flush with
WAB
and flush up under roof panels.
Secure
ZX
with 2" finish nails into rafter extensions
(Fig. B)
.
2
19/32" x 3-1/2" x 96" (1,5 x 8,8 x 243,8 cm)
x1
ZX
2" Finish
Nails
Flush
Flush
Flush
ZX
WAB
Fig. B
2" Finish
Nails
Rafter
Extension