• 3" Screw angled into 4x4.
• (2) at each point frame
and 4x4 touch.
Put both floor sections together and attach as shown using 3" nails.
4
You have finished your floor frame. Proceed to level and square frame.
10 x 12' FLOOR FRAME (Not Included)
(4) Nails per side,
stagger pattern.
FINISH
5
FINISH
5
LEVEL AND SQUARE FLOOR FRAME
Before attaching floor decking, it is important to level and square the floor frame.
A level and square floor frame is required to correctly construct your shed.
BEGIN
2
3
4
1
Use level and check the frame is level before applying floor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the
same, the frame is square. The diagonal measurement will be approximately 185" (470 cm).
When the frame is level and square secure (1) side of frame to the 4x4 runners using (1) fastener at
ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with (1) fastener
at ends of each runner making sure the frame remains square
(Fig. A)
.
Once the floor frame is level and square fasten the frame at each point the frame contacts the 4x4
runners. Go to page 16.
See page 8 for the preferred floor leveling method.
Fig. A
3" (7,6 cm)
x20
140-5/8"
(357,2 cm)
120"
(305 cm)
Section 2
Section 1
185"
(470 cm)
Runners are generally
12" (30,5 cm) from
ends of foor frame
and under seams.
4x4 Runners
(not included).
Seam
12"
(30,5 cm)
36"
(91,4 cm)
40-5/16"
(102,4 cm)
Centered
40-5/16"
(102,4 cm)
Centered
12"
(30,5 cm)
Measurements to
centers of 4x4's.
185"
(470 cm)