background image

MODEL

 

7420

Installation Manual

Summary of Contents for 7420

Page 1: ...MODEL 7420 Installation Manual...

Page 2: ......

Page 3: ...aterials and workmanship for the period specified in the warranty from the date of invoice SERVICE Technical Support is available 24 hours a day 7 days a week 1 800 411 3136 https www varsityscoreboar...

Page 4: ...LLERS If you are installing this scoreboard for a client please return the manual to the individual in charge of the scoreboard upon completion of installation SCOREBOARD DIMENSIONS 8 0 tall x 20 0 wi...

Page 5: ...EL 7420 INSTALLATION 6 7 INSTALLATION OVERVIEW 8 PRODUCT SPECIFICATIONS 9 DETERMINING LOCATION AND ORIENTATION 10 18 INSTALLING MOUNTING POLES OR I BEAMS 10 18 MOUNTING THE SCOREBOARD 10 18 TESTING IN...

Page 6: ...eboard Shipped in 5 sections Please inspect all shipping containers upon arrival for damage and ensure that you have all of the parts listed below ITEMS IN LARGE PACKAGE S 2 Mounting Tools 20 mounting...

Page 7: ...hat aren t sighted for as damaged upon arrival The shipper is responsible for filing a claim unless shipped 3rd party 1 Note DAMAGED on the Delivery Receipt Form including details of the type of damag...

Page 8: ...tion applies to all Follow this guide as closely as possible to ensure proper installation 1 Review the product specifications below to determine your specific installation hardware 2 Determine the sc...

Page 9: ...ased on customer s local building codes soil conditions and wind loads Flat Stock mounting brackets and bolts are supplied Support structure and mounting hardware supplied by installer others POWER RE...

Page 10: ...ld the system be used to score a daytime or afternoon game The scoreboard should be positioned so that sunlight does not glare off its face In the U S placement on the South or West side of the field...

Page 11: ...If a sponsor panel is to be mounted above the scoreboard leave 21 0 of pole beam above ground an additional 31 Remember Keep boom and lines away from power lines to avoid shock or electrical burn 2 T...

Page 12: ...rd arrange the panels in order A E from RIGHT to LEFT face down with the top away from the mounting poles or I beams Keep the panels aligned at the top and against each other making sure not to pinch...

Page 13: ...slowly raise the scoreboard to level it and clamp to the other end mounting pole or I Beam 9 Weld or bolt the mounting angle to the poles or I Beams you are clamped to and follow the same procedure a...

Page 14: ...DETERMINE NUMBER OF SPONSOR PANELS BEING INSTALLED AND THEIR LOCATION 1 20 Long 1 1 2 x 1 1 2 Mounting Angle 8 3 8 16 x 3 4 Bolts 16 3 8 Flat Washers 8 3 8 16 Hex Nuts 22 8 x 1 2 Tek Screws 2 31 x 10...

Page 15: ...3 8 flat washers and 3 8 hex nuts The brack ets fit inside the panel The top for top mounted installa tions or the bottom for bot tom mounted installations of each panel is pre drilled for the bracke...

Page 16: ...at the scoreboard TESTING THE INSTALLED SYSTEM Please refer to the OPERATORS MANUAL for startup instructions 1 While holding down the OPTIONS button turn the wireless controller on 2 The screen will d...

Page 17: ...ssfully installed your Varsity Scoreboard 4 Press the down arrow again to display Digits Count All digits should continuously count from 0 9 5 If all digits turn on and count the installer can then tu...

Page 18: ...18...

Reviews: