![background image](http://html1.mh-extra.com/html/backyard-products/gable-8x8/gable-8x8_assembly-manual_3348601032.webp)
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
1/4"
(0,6 cm)
5-15/16"
(15,1 cm)
5-15/16"
(15,1 cm)
11-7/8"
(30,2 cm)
2-1/2"
(6,4 cm)
2-1/2"
(6,4 cm)
Flush
DQ
Primed side UP
30
Place
RIGHT
gable panel primed side up, centered on
top DQ
as shown.
Secure using two 1-1/2" nails.
Orient
LEFT
gable panel primed side up, flush to right panel on
DQ's
with a
1-1/2" overhang on bottom. Nail using four 1-1/2" Nails.
Place
DQ
on flat on floor. Use
WX
as temporary supports as shown.
2
3
You have finished building your Front wall gable panels.
FINISH
4
BEGIN
1
FRONT WALL GABLE PANELS
PARTS REQUIRED:
x1
x1
x8
1-1/2" (3,8 cm)
DQ
x2
2 x 3 x 11-7/8" (5,1 x 7,6 x 30,2 cm)
WX
WX
x2
WX
2 x 3 x 55-3/4" (5,1 x 7,6 x 141,6 cm)